Planning and reliability assessment to integrate distributed automation system into distribution networks utilizing binary hybridPSOandGSAalgorithms considering uncertainties

被引:1
作者
Shafik, Muhammed B. [1 ,2 ]
Chen, Hongkun [1 ]
Rashed, Ghamgeen, I [1 ]
机构
[1] Wuhan Univ, Sch Elect Engn & Automat, Wuhan 430072, Peoples R China
[2] Kafrelsheikh Univ, Elect Power Syst & Machines Dept, Fac Engn, Kafrelsheikh, Egypt
关键词
automatic sectionalized switch placement; binary optimization; cost; benefit study; distributed automation; distribution networks; reliability; SWITCH PLACEMENT; OPTIMIZATION; ALGORITHM;
D O I
10.1002/2050-7038.12594
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Around the world, automation is transforming work, business, and the economy as one of the Pillars of a smart grid. The vital role behind utilizing the automation system into distribution networks is to achieve grid self-healing and improve the reliability level. Distributed Automation (DA) can be achieved via Smart secondary substations at each load point with installed automatic sectionalize switches that need a large investment. Therefore, this paper provides a long-term plan based on a cost/benefit study to define the optimal automation level of Distribution networks constrained with system reliability indices limits. DA planning is categorized as a non-linear Mixed Integer optimization problem with multi-dimensions. Hence, it is not possible to apply numerical algorithms to directly search for all possible automation scenarios. To solve that problem; Hybrid Particle Swarm Optimization and Gravitational Search Algorithm (HPSO-GSA) technique provides a binary-coded procedure to handle all the controlled variables to provide the best solution within the permissible limits. The effectiveness of the proposed methodology is demonstrated by applying it to RBTS-Bus 4 standard reliability test system considering uncertainty in Cost Damage Function (CDF), Investment Cost (IC), and Failure Rate (FR). Also, this paper study the effect of change in Depreciation ratio (DR), Load Growth (LG) rate besides; peak Load Change (LC). Finally, a reliability assessment using NEPLAN software is done for the optimal decision to enhance the technical analysis. Moreover, Distributed Generations (DG) has a significant impact on the reliability of distribution networks. Simulation results indicate that the system reliability cost is significantly reduced with adequate system reliability level, with comparative results to those in literary studies.
引用
收藏
页数:18
相关论文
共 50 条
[21]   Multi-objective distributed generation planning in distribution network considering correlations among uncertainties [J].
Zhang, Shenxi ;
Cheng, Haozhong ;
Li, Ke ;
Tai, Nengling ;
Wang, Dan ;
Li, Furong .
APPLIED ENERGY, 2018, 226 :743-755
[22]   Linear Formulations for Topology-Variable-Based Distribution System Reliability Assessment Considering Switching Interruptions [J].
Jooshaki, Mohammad ;
Abbaspour, Ali ;
Fotuhi-Firuzabad, Mahmud ;
Munoz-Delgado, Gregorio ;
Contreras, Javier ;
Lehtonen, Matti ;
Arroyo, Jose M. .
IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (05) :4032-4043
[23]   Multistage expansion planning for active distribution networks under demand and Distributed Generation uncertainties [J].
Tancredo Borges, Carmen Lucia ;
Martins, Vinicius Ferreira .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 36 (01) :107-116
[24]   Short-Term Electrical Distribution Systems Planning Considering Distributed Generation and Reliability [J].
da Cunha Paiva R.R. ;
Rueda-Medina A.C. ;
Mantovani J.R.S. .
Journal of Control, Automation and Electrical Systems, 2017, 28 (04) :552-566
[25]   Regional integrated energy system reliability and low carbon joint planning considering multiple uncertainties [J].
Yang, Baijie ;
Ge, Shaoyun ;
Liu, Hong ;
Zhang, Xihai ;
Xu, Zhengyang ;
Wang, Saiyi ;
Huang, Xin .
SUSTAINABLE ENERGY GRIDS & NETWORKS, 2023, 35
[26]   Stochastic Optimal Planning of Distribution System Considering Integrated Photovoltaic-Based DG and DSTATCOM Under Uncertainties of Loads and Solar Irradiance [J].
Oda, Eyad S. ;
Hamed, Amal M. Abd El ;
Ali, Abdelfatah ;
Elbaset, Adel A. ;
Sattar, Montaser Abd El ;
Ebeed, Mohamed .
IEEE ACCESS, 2021, 9 :26541-26555
[27]   Integration of distributed generation for assessment of distribution system reliability considering power loss, voltage stability and voltage deviation [J].
Dixit, Mukul ;
Kundu, Prasanta ;
Jariwala, Hitesh R. .
ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2019, 10 (02) :489-515
[28]   Integrated Planning of Cyber-Physical Active Distribution System Considering Multidimensional Uncertainties [J].
Gao, Hongjun ;
Lyu, Xiaodong ;
He, Shuaijia ;
Wang, Lingfeng ;
Wang, Cheng ;
Liu, Junyong .
IEEE TRANSACTIONS ON SMART GRID, 2022, 13 (04) :3145-3159
[29]   Reliability analysis of distribution system with distributed generation considering loss of protection coordination [J].
Chaitusaney, S. ;
Yokoyama, A. .
2006 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, VOLS 1 AND 2, 2006, :1179-1186
[30]   Operation risk assessment of active distribution networks considering probabilistic uncertainties of distributed generators-loads and power management of VRB ESSs [J].
Lei, Jiazhi ;
Gong, Qingwu ;
Gao, David Wenzhong ;
Wang, Baohua ;
Guan, Xiangyu .
IET RENEWABLE POWER GENERATION, 2020, 14 (10) :1764-1771