A review on nuclear power plant scenario in Thailand

被引:14
作者
Pongsoi, Parinya [1 ]
Wongwises, Somchai [1 ,2 ]
机构
[1] King Mongkuts Univ Technol Thonburi, Dept Mech Engn, Fluid Mech Thermal Engn & Multiphase Flow Res Lab, Fac Engn, Bangkok 10140, Thailand
[2] Royal Inst Thailand, Acad Sci, Bangkok 10300, Thailand
关键词
Nuclear energy; Nuclear power plant; Thailand;
D O I
10.1016/j.rser.2013.03.038
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Since early civilization, humans have required energy. Energy grows increasingly important with globalization. The search for energy sets nuclear power as the highest priority for generating electricity. The need to delay global warming initiated a nuclear power plant using a nuclear reactor as its source of thermal energy to generate pollution-free electrical currents. Many countries see the important advantages of nuclear power plants, and Thailand plans nuclear power plant projects (NPP) to be built by the Electricity Generating Authority of Thailand (EGAT). These projects have improved, and the latest Power Development Plan 2010-2030 (PDP 2010) states that by 2023, Thailand will build nuclear power plants with electrical productivity of about 4000 MW. The plants will generate commercial electricity for domestic consumption with plans to increase productivity in preparation for Thailand's economic growth and its participation in the ASEAN Economic Community (AEC). These efforts stem from investments in domestic and international industrial businesses in order to impress foreign countries with Thailand's energy security policy. However, the Thai people are concerned with the impacts of nuclear power plants. The people of Thailand require societal awareness in the construction of these plants. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:586 / 592
页数:7
相关论文
共 28 条
[11]   THE DEPLETION OF OIL [J].
CAMPBELL, CJ .
MARINE AND PETROLEUM GEOLOGY, 1992, 9 (06) :666-671
[12]  
Chaikan C, 2012, VIETNAM ASEAN NUCL E
[13]   The peak of oil production-Timings and market recognition [J].
de Almeida, Pedro ;
Silva, Pedro D. .
ENERGY POLICY, 2009, 37 (04) :1267-1276
[14]  
Department of Alternative Energy Development and Efficiency. Ministry of Energy, 2011, THAIL EN STAT
[15]  
Electricity Generating Authority of Thailand (EGAT) Nuclear Power Program Development, 2011, NUCL POW PROGR DEV E
[16]  
Energy Policy and Planning Office Ministry of Energy, 2010, SUMM POW DEV PLAN 20
[17]  
Energy Policy and Planning Office Ministry of Energy, 2011, THAIL POW DEV PLAN 2
[18]  
International Atomic Energy Agency IAEA, 2012, INT AT EN AG REF DAT
[19]   Renewable energy and nuclear power towards sustainable development: Characteristics and prospects [J].
Karakosta, Charikleia ;
Pappas, Charalampos ;
Marinakis, Vangelis ;
Psarras, John .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 22 :187-197
[20]   Forecasting coal production until 2100 [J].
Mohr, S. H. ;
Evans, G. M. .
FUEL, 2009, 88 (11) :2059-2067