The Berth Allocation Problem with Channel Restrictions

被引:57
作者
Corry, Paul [1 ]
Bierwirth, Christian [2 ]
机构
[1] Queensland Univ Technol, Brisbane, Qld 4000, Australia
[2] Martin Luther Univ Halle Wittenberg, D-06108 Halle, Germany
关键词
discrete berth allocation; ship channel scheduling; tidal ranges; OPTIMIZATION;
D O I
10.1287/trsc.2018.0865
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Shipping channels are often a constraint to port capacity because of the significant capital cost and environmental impact of channel dredging. Channels are often narrow in places, which constrains the capability of vessels passing in opposing directions. Capacity impacts of channel operations are significant in tidally restricted ports, where deep draft vessels are able to move through the channel only during narrow windows around high tide to maintain sufficient under-keel clearance. There has been much research to date around berth allocation and sequencing, but in channel-constrained ports, the value of these existing approaches can be limited. This is particularly apparent in a numerical example presented in this paper where the berth allocations are suboptimal when the channel is not considered. In this paper, we present an approach to optimize the scheduling of channel movements and, furthermore, to integrate the channel scheduling and berth allocation/sequencing problems. A mixed integer program formulation is presented for this problem, based on a no-wait bidirectional flow shop with parallel machines. Benchmark problems consistent with the literature for berth allocation/sequencing have been modified to incorporate a range of channel configurations and used as test cases for the proposed model.
引用
收藏
页码:708 / 727
页数:20
相关论文
共 23 条
[1]   Disjunctive constraints for manufacturing scheduling: Principles and extensions [J].
Baptiste, P ;
LePape, C .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1996, 9 (04) :306-310
[2]   A follow-up survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) :675-689
[3]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[4]   Models for the discrete berth allocation problem: A computational comparison [J].
Buhrkal, Katja ;
Zuglian, Sara ;
Ropke, Stefan ;
Larsen, Jesper ;
Lusby, Richard .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (04) :461-473
[5]   A disjunctive graph model and framework for constructing new train schedules [J].
Burdett, R. L. ;
Kozan, E. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (01) :85-98
[6]   Seaside operations in container terminals: literature overview, trends, and research directions [J].
Carlo, Hector J. ;
Vis, Iris F. A. ;
Roodbergen, Kees Jan .
FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2015, 27 (2-3) :224-262
[7]   Models and tabu search heuristics for the Berth-allocation problem [J].
Cordeau, JF ;
Laporte, G ;
Legato, P ;
Moccia, L .
TRANSPORTATION SCIENCE, 2005, 39 (04) :526-538
[8]   Modeling and solving the Tactical Berth Allocation Problem [J].
Giallombardo, Giovanni ;
Moccia, Luigi ;
Salani, Matteo ;
Vacca, Ilaria .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2010, 44 (02) :232-245
[9]  
Hansen P, 2003, G200330 HEC MONTR GR
[10]   Optimal scheduling of trains on a single line track [J].
Higgins, A ;
Kozan, E ;
Ferreira, L .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1996, 30 (02) :147-161