Application of Reliability Engineering Methodology in Next Generation Satellite Power System Design, Manufacturing, and Testing

被引:0
作者
Harmandali, Murat [1 ]
Karagoz, F. Ercan [2 ]
Ozkaya, Hasan [2 ]
Baylakoglu, Ilknur [1 ]
Akkus, Emrah [2 ]
机构
[1] TUBITAK Space Technol Res Inst UZAY, Qual Management & Ind Serv Dept, Reliabil & Safety Engn Grp, Ankara, Turkey
[2] TUBITAK Space Technol Res Inst UZAY, Satellite Technol Dept, Elect Design Grp, Ankara, Turkey
来源
PROCEEDINGS OF 6TH INTERNATIONAL CONFERENCE ON RECENT ADVANCES IN SPACE TECHNOLOGIES (RAST 2013) | 2013年
关键词
reliability engineering; analysis; inspection; test; satellite; power system; power distribution; UYGAR; FMECA; derating; life prediction; worst case;
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Space systems are complex and need to perform under extreme environmental conditions for its expected life, so it is vital to use methodological risk identification and validation of the product in the design stage. For this purpose, the reliability analyses, inspections, and environmental tests mentioned in this paper have been performed methodically during several projects in TUBITAK UZAY. In this paper, TUBITAK UZAY reliability engineering methodology, where ECSS, European Cooperation on Space Standardization standards are used as a guideline, are presented and a real application has been performed for TUBITAK UZAY's Next Generation (NG) Power Distribution Module, UYGAR. Since UYGAR is designed as a part of TUBITAK UZAY's NG power system architecture for Low Earth Orbit, Geostationary Earth Orbit, and Science Missions with a long life high reliability expectation; reliability engineering approach at the beginning of the project becomes crucial. Moreover, power system special requirements are tailored according to European Standard for Space and Electronic Equipment "ECSS-E-ST-20C" and Electrical Power Systems for Unmanned Spacecraft "AIAA-S-122-2007", by considering single point failure and failure propagation free design to make the electronic design more challenging/robust and make reliability engineering involved in all phases of the project life.
引用
收藏
页码:693 / 697
页数:5
相关论文
共 8 条
[1]  
[Anonymous], 1992, PSS01301 ESA
[2]  
[Anonymous], 2011, ECSSQST3011C
[3]  
[Anonymous], 2009, ECSSQST3002C
[4]  
[Anonymous], 1995, MIL-HDBK-217F Notice 2
[5]  
[Anonymous], 2011, ECSSOHB3001A
[6]  
[Anonymous], 62380 IEC TR
[7]  
[Anonymous], 2006, 56984 TM
[8]  
Ozkaya H., 2013, REC ADV SPAC TECH RA