Determination of common due window location in a single machine scheduling problem

被引:62
作者
Liman, SD [1 ]
Panwalkar, SS [1 ]
Thongmee, S [1 ]
机构
[1] LONESTAR CO,PUNE,MAHARASHTRA,INDIA
关键词
scheduling theory; production; just-in-time;
D O I
10.1016/0377-2217(95)00181-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the static deterministic single machine scheduling problem in which all jobs have a common due window. Jobs that are completed within the window incur no penalty. The objective is to find the optimal sequence and the optimal common due window location given that the due window size is a problem parameter such that the weighted sum of earliness. tardiness, and due window location penalties is minimized. We propose an O(n log n) algorithm to solve the problem. Me also consider two special cases For which simple solutions can be obtained.
引用
收藏
页码:68 / 74
页数:7
相关论文
共 13 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]   OPTIMAL COMMON DUE-DATE WITH LIMITED COMPLETION-TIME DEVIATION [J].
CHENG, TCE .
COMPUTERS & OPERATIONS RESEARCH, 1988, 15 (02) :91-96
[3]   OPTIMAL COMMON DUE-DATE WITH LIMITED COMPLETION-TIME [J].
DICKMAN, B ;
WILAMOWSKY, Y ;
EPSTEIN, S .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (01) :125-127
[4]  
Gunn T., 1992, OR MS TODAY, V19, P16
[5]  
Kramer F.-J., 1993, Production and Operations Management, V2, P262, DOI 10.1111/j.1937-5956.1993.tb00102.x
[6]  
KRAMER FJ, 1994, MATH COMPUT MODEL, V200, P69
[7]  
LEE CY, 1991, EARLINES TARDINESS S
[8]   EARLINESS TARDINESS SCHEDULING PROBLEMS WITH A COMMON DELIVERY WINDOW [J].
LIMAN, SD ;
RAMASWAMY, S .
OPERATIONS RESEARCH LETTERS, 1994, 15 (04) :195-203
[9]   COMMON DUE DATE ASSIGNMENT TO MINIMIZE TOTAL PENALTY FOR THE ONE MACHINE SCHEDULING PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1982, 30 (02) :391-399
[10]  
Raghavachari M., 1988, Opsearch, V25, P144