Multi-Batch Production Scheduling for Distributed Serial Lines with Unreliable Machines and Finite Buffers

被引:0
|
作者
Huang, Longzhu [1 ,2 ]
Jia, Zhiyang [1 ,2 ]
Wang, Xiaohan [1 ,2 ]
Chen, Jingchuan [1 ,2 ]
机构
[1] Beijing Inst Technol, Sch Automat, Beijing 100081, Peoples R China
[2] State Key Lab Intelligent Control & Decis Complex, Beijing 100081, Peoples R China
来源
2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC) | 2021年
关键词
Bernoulli machine; Intelligent manufacturing; Production scheduling; Transient analysis; ALGORITHM; MODELS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the modern manufacturing environment, the production systems develop towards a flexible direction due to the market demands of multiple varieties and small batch-based customized products. To make better use of the existing resources and to improve production efficiency, distributed manufacturing mode begins to appear. This paper concentrates on a multi-type production scheduling problem for distributed serial lines. Specifically, unreliable machines and finite buffers are considered, which are more realistic in the practical production. The mathematical model for the production system with two Bernoulli machines is formulated first. Then, under the hypothetical model mentioned above, the main work of this article is to propose the exact and approximate analyses to calculate the performance indicators. Based on the analysis of the model, the genetic algorithm is applied to optimize the maximum completion time on the distributed serial lines for multi-batch-based production tasks. Finally, the feasibility and effectiveness of the mathematical model and the proposed algorithm are verified through numerical experiments.
引用
收藏
页码:6436 / 6441
页数:6
相关论文
共 42 条
  • [1] Flexible preventative maintenance for serial production lines with multi-stage degrading machines and finite buffers
    Kang, Yunyi
    Ju, Feng
    IISE TRANSACTIONS, 2019, 51 (07) : 777 - 791
  • [2] Transient Analysis and Scheduling of Bernoulli Serial Lines With Multi-Type Products and Finite Buffers
    Wang, Xiaohan
    Dai, Yaping
    Wang, Ling
    Jia, Zhiyang
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2023, 20 (04) : 2367 - 2382
  • [3] An improved decomposition method for evaluating the performance of transfer lines with unreliable machines and finite buffers
    Xia, Beixin
    Xi, Lifeng
    Zhou, Binghai
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (15) : 4009 - 4024
  • [4] An efficient analytical method for performance evaluation of transfer lines with unreliable machines and finite transfer-delay buffers
    Xia, Beixin
    Xi, Lifeng
    Zhou, Binghai
    Du, Shichang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (06) : 1799 - 1819
  • [5] Transient Performance Analysis of Closed Production Lines With Bernoulli Machines, Finite Buffers, and Carriers
    Jia, Zhiyang
    Zhang, Liang
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2017, 2 (04): : 1893 - 1900
  • [6] Selective Assembly System With Unreliable Bernoulli Machines and Finite Buffers
    Ju, Feng
    Li, Jingshan
    Deng, Weiwen
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2017, 14 (01) : 171 - 184
  • [7] Approximations of time-dependent unreliable flow lines with finite buffers
    Goettlich, S.
    Kuehn, S.
    Schwarz, J. A.
    Stolletz, R.
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2016, 83 (03) : 295 - 323
  • [8] Multi-batch integrated scheduling algorithm based on time-selective
    Xiaohuan Zhang
    Chi Ma
    Jie Wu
    Multimedia Tools and Applications, 2019, 78 : 29989 - 30010
  • [9] Multi-batch integrated scheduling algorithm based on time-selective
    Zhang, Xiaohuan
    Ma, Chi
    Wu, Jie
    MULTIMEDIA TOOLS AND APPLICATIONS, 2019, 78 (21) : 29989 - 30010
  • [10] Serial production lines with geometric machines and finite production runs: performance analysis and system-theoretic properties
    Jia, Zhiyang
    Zhang, Liang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (08) : 2247 - 2262