Risk evaluation and prevention in hydropower plant operations: A model based on Pythagorean fuzzy AHP

被引:108
作者
Yucesan, Melih [1 ]
Kahraman, Gokhan [1 ]
机构
[1] Munzur Univ, Dept Mech Engn, TR-62000 Tunceli, Turkey
关键词
PFAHP; Hazards; Hydroelectric power plants; OCCUPATIONAL-HEALTH; DECISION-MAKING; SAFETY; EXTENSION;
D O I
10.1016/j.enpol.2018.11.039
中图分类号
F [经济];
学科分类号
02 ;
摘要
Hydropower generation facilities are becoming increasingly popular in many parts of the world. One of the main reasons for this situation is that the resource reserves such as coal, petroleum and natural gas, which are called conventional energy sources, decrease day by day and their prices rise. So the efficient operation of hydroelectric power plants has become very important. When these plants are operated, it is possible to cause many hazards, including injury, illness, death, damage to the environment, property and equipment. In this study, it is aimed to perform risk assessment for hydroelectric power plants using Pythagorean fuzzy Analytical hierarchy process (PFAHP) method. The team of experts has identified twenty hazards and their results that could occur in the operation of the hydroelectric power plant. The weights of the hazards were determined by using linguistic expressions. Preventive measures have been taken for the three most important hazards. The results of this study are expected to contribute to the safety of hydropower plants and the prevention of financial losses.
引用
收藏
页码:343 / 351
页数:9
相关论文
共 38 条
[1]  
[Anonymous], 1981, MULTIPLE ATTRIBUTE D
[2]   Failure Modes and Effects Analysis (FMEA) for wind turbines [J].
Arabian-Hoseynabadi, H. ;
Oraee, H. ;
Tavner, P. J. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2010, 32 (07) :817-824
[3]   INTUITIONISTIC FUZZY-SETS [J].
ATANASSOV, KT .
FUZZY SETS AND SYSTEMS, 1986, 20 (01) :87-96
[4]  
Bowles D. S., 2001, 20 YEAR RETROSPECTIV, P17
[5]  
Bowles D.S., 1998, P USCOLD 1998 ANN LE
[6]   A Comparative Analysis of Accident Risks in Fossil, Hydro, and Nuclear Energy Chains [J].
Burgherr, Peter ;
Hirschberg, Stefan .
HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2008, 14 (05) :947-973
[7]   Research on 10-year tendency of China coal mine accidents and the characteristics of human factors [J].
Chen, Hong ;
Qi, Hui ;
Long, Ruyin ;
Zhang, Maolong .
SAFETY SCIENCE, 2012, 50 (04) :745-750
[8]   Fuzzy group decision making for evaluating the rate of aggregative risk in software development [J].
Chen, SM .
FUZZY SETS AND SYSTEMS, 2001, 118 (01) :75-88
[9]   Risk analysis as a basis for safety management system [J].
Demichela, M ;
Piccinim, N ;
Romano, A .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2004, 17 (03) :179-185
[10]   Environmental impacts of energy [J].
Dincer, I .
ENERGY POLICY, 1999, 27 (14) :845-854