The effects of tamping on railway track geometry degradation

被引:97
作者
Audley, M. [1 ]
Andrews, J. D. [1 ]
机构
[1] Univ Nottingham, Nottingham Transportat Engn Ctr, Nottingham NG7 2RD, England
关键词
Railway track degradation; degradation models; tamping; maintenance; maintenance modelling; track geometry degradation;
D O I
10.1177/0954409713480439
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The UK rail industry remains a safe, reliable and competitive alternative to other forms of transport. Maintaining such an ageing, increasingly utilized, railway network with limited financial resources is a major challenge. By utilizing data on the UK network track geometry collected over six years, along with available records of maintenance performed during this period, the effects of tamping on track geometry degradation have been analysed. This paper presents a Weibull approach to analyse the distributions of times for the track geometry to degrade to specified states following maintenance. Track quality is given by the standard deviation of the averaged vertical position of the rails taken over a 35m wavelength. The quality of the track geometry is also investigated after tamping has been performed. The results of this study show that traffic speed and the maintenance history of any line have an effect on geometry deterioration. Furthermore, support is provided to the argument that tamping damages track ballast.
引用
收藏
页码:376 / 391
页数:16
相关论文
共 50 条
  • [41] Prediction of track geometry degradation using artificial neural network: a case study
    Khajehei, Hamid
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Haddadzade, Mohammad
    Nissen, Arne
    Jebelli, Mohammad Javad Latifi
    [J]. INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2022, 10 (01) : 24 - 43
  • [42] Preventive condition-based tamping for railway tracks: a decision support model
    Li, R.
    Salling, K. B.
    Zoeteman, A.
    Wolfert, A. R. M.
    [J]. LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 1937 - 1943
  • [43] Railway track availability modelling with opportunistic maintenance practice
    Davies, Ben
    Andrews, John
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2022, 236 (08) : 907 - 919
  • [44] Stochastic analysis for estimating track geometry degradation rates based on GPR and LiDAR data
    Goodarzi, Saeed
    Kashani, Hamed F.
    Saeedi, Anahita
    Oke, Jimi
    Ho, Carlton L.
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2023, 369
  • [45] Uncertainty in Rail-Track Geometry Degradation: Lisbon-Oporto Line Case Study
    Andrade, A. Ramos
    Teixeira, P. Fonseca
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 2011, 137 (03) : 193 - 200
  • [46] Impact of Unused Life for Track Sections and Available Workforce in Scheduling Tamping Actions on Ballasted Tracks
    Daddow, Mohammad
    Zhang, Xiedong
    Qiu, Hongsheng
    Zhang, Zhihua
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (06) : 2403 - 2412
  • [47] Optimization of maintenance strategies for railway track-bed considering probabilistic degradation models and different reliability levels
    Bressi, Sara
    Santos, Joao
    Losa, Massimo
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 207
  • [48] Data-driven ballast layer degradation identification and maintenance decision based on track geometry irregularities
    Zhao, Wenbo
    Qiang, Weile
    Yang, Fei
    Jing, Guoqing
    Guo, Yunlong
    [J]. INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2024, 12 (04) : 581 - 603
  • [49] Modeling of track geometry degradation and decisions on safety and maintenance: A literature review and possible future research directions
    Higgins, Christian
    Liu, Xiang
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2018, 232 (05) : 1385 - 1397
  • [50] Modelling degradation rates of track geometry local defects: Lisbon-Porto line case study
    Rodrigues, Pedro
    Teixeira, Paulo F.
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2024, 20 (06) : 867 - 882