Comparison of Classical and "Cause Consequence Diagrams" Recursive Operability Analysis: the T2 Laboratories Accident

被引:4
作者
Contini, Sergio [1 ]
Contini, Paolo Mario [1 ]
Torretta, Vincenzo [2 ]
Cattaneo, Carlo Sala [3 ]
Raboni, Massimo [4 ]
Copelli, Sabrina [1 ]
机构
[1] Univ Insubria, Dip Sci & Alta Tecnol, Via GB Vico 46, I-21100 Varese, Italy
[2] Univ Insubria, Dip Biotecnol & Sci Vita, Via GB Vico 46, I-21100 Varese, Italy
[3] Artyll Soc Lombarda Ingn, Via Poerio 10, I-20025 Legnano, MI, Italy
[4] Univ LIUC Cattaneo, Scuola Ingn Ind, Corso Matteotti 22, I-21053 Castellanza, VA, Italy
来源
CISAP7: 7TH INTERNATIONAL CONFERENCE ON SAFETY & ENVIRONMENT IN PROCESS INDUSTRY | 2016年 / 53卷
关键词
RISK ANALYSIS; HAZOP; TOOL;
D O I
10.3303/CET1653019
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
On December 19, 2007, a powerful explosion and fire killed four employees and destroyed T2 Laboratories, Inc., a chemical manufacturer in Jacksonville, Florida. In the accident 32 people were injured, including 4 employees and 28 members of the public who were working in the surroundings. Debris was found up to one mile away, and the explosion damaged buildings within one quarter mile of the facility. After the accident, the question which arose was: could an even simplified risk analysis prevent such a tragedy? It is widely accepted that performing a detailed Quantitative Risk Analysis (QRA) is a complex and time consuming task because of all the steps which must be carried out: 1) hazards identification; 2) frequency estimation; 3) accident consequence evaluation; 4) individual and societal risk calculation. Specifically, Hazard Identification (HI) and Frequency Estimation (FE) represent two fundamental activities since: 1) not identified hazards can remain hidden until the occurrence of the related accidents; 2) the probabilistically quantification of the hazardous plant states frequencies, e.g. through Fault Tree Analysis (FTA), helps to support decisions making on risk reduction. Particularly, since generating FTs is a time consuming task, the Recursive Operability Analysis (ROA) has been ideated. ROA, both in its classical and revised version (called Recursive Operability Analysis - Cause Consequence Diagrams, ROA-CCD), is based on a procedure which allows collecting plant perturbations data in a structured way. The aim of this work is to apply both the classical and the new ROA-CCD analysis on the T2 Laboratories chemical plant (with particular reference to the reactor node) in order to identify all the possible top events and states of plant unavailability. In this way, it has been evidenced that even a simplified but reliable risk analysis could have been unearthed clearly all plant criticalities. Moreover, the results concerning the risk quantification have been critically analyzed showing that ROA-CCD achieves the same results, in terms of Minimal Cut Sets, of its classical version with a lower effort. This goal is fulfilled by avoiding the unnecessary subdivision of the plant into nodes prior to perform the analysis; in this way, considering only the process variables related to the "key piece of equipment" (in this case, the reactor), records in the ROA format are drastically reduced.
引用
收藏
页码:109 / 114
页数:6
相关论文
共 9 条
[1]  
[Anonymous], 2015, SAFETY RELIABILITY C
[2]   The systematic integration of human factors into safety analyses: An integrated engineering approach [J].
Colombo, S. ;
Demichela, M. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2008, 93 (12) :1911-1921
[3]  
CSB (U.S. Chemical Safety Board), 2009, RUN EXPL T2 LAB REP
[4]   Risk analysis of a typical chemical industry using ORA procedure [J].
Khan, FI ;
Abbasi, SA .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2001, 14 (01) :43-59
[5]   TOPHAZOP: A knowledge-based software tool for conducting HAZOP in a rapid, efficient yet inexpensive manner [J].
Khan, FI ;
Abbasi, SA .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 1997, 10 (5-6) :333-343
[6]   Towards automation of HAZOP with a new tool EXPERTOP [J].
Khan, FI ;
Abbasi, SA .
ENVIRONMENTAL MODELLING & SOFTWARE, 2000, 15 (01) :67-77
[7]   PROBABILISTIC ANALYSIS OF TRANSIENT EVENTS BY AN EVENT TREE DIRECTLY EXTRACTED FROM OPERABILITY ANALYSIS - EVALUATION OF ACCIDENTAL RELEASES OF GAS FROM A PRESSURE-REGULATING INSTALLATION [J].
PICCININI, N ;
SCARRONE, M ;
CIARAMBINO, I .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 1994, 7 (01) :23-32
[8]   Risk based decision-making in plant design [J].
Piccinini, Norberto ;
Demichela, Micaela .
CANADIAN JOURNAL OF CHEMICAL ENGINEERING, 2008, 86 (03) :316-322
[9]   Review of 62 risk analysis methodologies of industrial plants [J].
Tixier, J ;
Dusserre, G ;
Salvi, O ;
Gaston, D .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2002, 15 (04) :291-303