Due date and cost-based FMS loading, scheduling and tool management

被引:22
作者
Turkcan, Ayten [1 ]
Akturk, M. Selim
Storer, Robert H.
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
[3] Lehigh Univ, Dept Ind & Syst Engn, Bethlehem, PA 18015 USA
关键词
tool management; scheduling; flexible manufacturing systems; loading;
D O I
10.1080/00207540600559955
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider flexible manufacturing system loading, scheduling and tool management problems simultaneously. Our aim is to determine relevant tool management decisions, which are machining conditions selection and tool allocation, and to load and schedule parts on non-identical parallel CNC machines. The dual objectives are minimization of the manufacturing cost and total weighted tardiness. The manufacturing cost is comprised of machining and tooling costs (which are affected by machining conditions) and non-machining cost (which is affected by tool replacement decisions). We used both sequential and simultaneous approaches to solve our problem to show the superiority of the simultaneous approach. The proposed heuristics are used in a problem space genetic algorithm in order to generate a series of approximately efficient solutions.
引用
收藏
页码:1183 / 1213
页数:31
相关论文
共 24 条
[1]   Integrated scheduling and tool management in flexible manufacturing systems [J].
Akturk, MS ;
Ozkan, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (12) :2697-2722
[2]   Tool allocation and machining conditions optimization for CNC machines [J].
Akturk, MS ;
Avci, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (02) :335-348
[3]  
Amoako-Gyampah K., 1994, International Journal of Flexible Manufacturing Systems, V6, P179, DOI 10.1007/BF01328811
[4]  
Avci S, 2003, IIE TRANS, V35, P479, DOI 10.1080/07408170390187924
[5]   Heuristic optimization system for the determination of index positions on CNC magazines with the consideration of cutting tool duplications [J].
Baykasoglu, A ;
Dereli, T .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (07) :1281-1303
[6]   AN INTERACTIVE PROCEDURE FOR BI-CRITERIA PRODUCTION SCHEDULING [J].
BERNARDO, JJ ;
LIN, KS .
COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (06) :677-688
[7]  
Ernst AT, 1999, NETWORKS, V34, P229, DOI 10.1002/(SICI)1097-0037(199910)34:3<229::AID-NET8>3.0.CO
[8]  
2-W
[9]   Heuristic procedures for the parallel machine problem with tool switches [J].
Fathi, Y ;
Barnette, KW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (01) :151-164
[10]  
Goldberg D.E, 1989, GENETIC ALGORITHMS S