Uncertainty in value stream mapping analysis

被引:44
作者
Braglia, Marcello [1 ]
Frosolini, Marco [1 ]
Zammori, Francesco [1 ]
机构
[1] Univ Pisa, Dipartimento Ingn Meccan Nucl & Prod, I-56126 Pisa, Italy
关键词
lean manufacturing; fuzzy theory; stochastic approach; value stream mapping; NUMBERS;
D O I
10.1080/13675560802601559
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this article, two alternative approaches to include variability analysis in value stream mapping (VSM) are presented. Notoriously, VSM is one of the best tools to map a process and to identify its main criticalities in order to enhance lean manufacturing. Unfortunately, in the standard approach, data are recorded on the map as deterministic, disregarding the real variability of the process. This is a strong limit because, especially within manufacturing processes, variability has a significant impact on costs and leads to several wastes. Therefore, it must be carefully analysed and reduced before lean manufacturing can be set into place. To overcome this weakness, this article proposes two alternative approaches based on statistics and fuzzy algebra, respectively. Both methods are designed to support practitioners and can be easily applied to several industrial applications. Their practicality is finally demonstrated through an industrial application of relevance. Obtained results are compared and respective advantages/disadvantages are presented and discussed.
引用
收藏
页码:435 / 453
页数:19
相关论文
共 22 条
[1]  
ABBAS Z, 2001, LEAN MAN SOL C STLOU
[2]  
[Anonymous], 1993, INTRO FUZZY CONTROL, DOI DOI 10.1007/978-3-662-11131-4
[3]  
[Anonymous], 1991, SIMULATION MODELING
[4]   A new value stream mapping approach for complex production systems [J].
Braglia, M. ;
Carmignani, G. ;
Zammori, F. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (18-19) :3929-3952
[5]   Ranking fuzzy numbers using α-weighted valuations [J].
Detyniecki, M ;
Yager, RR .
INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2000, 8 (05) :573-591
[6]  
Emiliani M.L., 2000, Management Decision, V38, P60, DOI DOI 10.1108/00251740010317423
[7]  
Facchinetti G, 1998, INT J INTELL SYST, V13, P613, DOI 10.1002/(SICI)1098-111X(199807)13:7<613::AID-INT2>3.0.CO
[8]  
2-N
[9]  
FARNUM NR, 1987, J OPER RES SOC, V38, P287
[10]   FUZZY PROJECT SCHEDULING SYSTEM FOR SOFTWARE-DEVELOPMENT [J].
HAPKE, M ;
JASZKIEWICZ, A ;
SLOWINSKI, R .
FUZZY SETS AND SYSTEMS, 1994, 67 (01) :101-117