This work investigates the installation of a 10 MW solar PV power plant in a sustainable city in Sudan. Initially, the climatic data such as relative humidity, temperature and horizontal solar radiation over 30 cities in Sudan were collected from NASA web page, then the behavior of all climatic data was analyzed. Annual daily solar radiation on a tilted surface was also calculated over the 30 locations around the country. It was found that the maximum value of tilted average solar radiation is 6.61 KWh/day at Dungola from fixed mode and 8.93 kWh/m(2)/day from tracking mode. Consequently, the location was selected as an optimum spot for building the solar PV power plant. Additionally, the available solar PV panels on the market were judged according to the maximum module efficiency and high ratio value of module capacity to frame area. The project lifetime is considered as 25 years. RETScreen v.4 software was used to simulate the feasibility analysis of the project based on electric power generated from fixed and tracking modes of operation, financial analysis and greenhouse gas emissions. The study showed that, technically, the proposed plant can generate up to 16.209 GWh of electric energy annually from the fixed system and 21.828 GWh from the tracking system. Environmentally, the annual net GHG reduction is 16,000 and 21,600 tons of CO2 from fixed and tracking systems respectively. From a financial standpoint, the cost-effective indicators were calculated and it was found that the IRR and paybaCk period for the fixed system plant were 0.6% and 23.6 years, respectively. While for tracking system plant, figures were 2.66% and 19.4 years, respectively.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Techno-economic analysis of a proposed 10 MW geothermal power plant in Fiji
    Prasad, Ravita D.
    Raturi, Atul
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 53
  • [2] Techno-economic analysis of a proposed 10 MW geothermal power plant in Fiji
    Prasad, Ravita D.
    Raturi, Atul
    Sustainable Energy Technologies and Assessments, 2022, 53
  • [3] Techno-economic and Environmental Analysis of a 2.5 MW Solar PV Based Power Plant in Bangladesh
    Redwan, Rahat
    Khan, Md. Sabid
    Seema, Sanjida Akter
    Roy, Chanchal
    Hasan, Mahmudul
    Chowdhury, Nahid-Ur-Rahman
    PROCEEDINGS OF 2024 7TH INTERNATIONAL CONFERENCE ON DEVELOPMENT IN RENEWABLE ENERGY TECHNOLOGY, ICDRET 2024, 2024,
  • [4] TECHNO-ECONOMIC FEASIBILITY STUDY OF INSTALLING SOLAR PV SYSTEMS ON GAS STATIONS' ROOFTOPS IN KUWAIT
    Gharbia, Yousef
    Anany, Mohammed
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2017 VOL 6, 2018,
  • [5] Techno-economic analysis of a hybrid solar Thermal-PV power plant
    Khajepour, Sadegh
    Ameri, Mehran
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2020, 42
  • [6] Techno-economic analysis and environmental impact assessment of a 10 MW biomass-based power plant in Malaysia
    Malek, A. B. M. Abdul
    Hasanuzzaman, Md
    Rahim, Nasrudin Abd
    Al Turki, Yusuf A.
    JOURNAL OF CLEANER PRODUCTION, 2017, 141 : 502 - 513
  • [7] Techno-Economic Feasibility Analysis of 100 MW Solar Photovoltaic Power Plant in Pakistan
    Abas, Naeem
    Rauf, Shoaib
    Saleem, Muhammad Shoaib
    Irfan, Muhammad
    Hameed, Suleman Abdul
    TECHNOLOGY AND ECONOMICS OF SMART GRIDS AND SUSTAINABLE ENERGY, 2022, 7 (01):
  • [8] Techno-Economic Feasibility Analysis of 100 MW Solar Photovoltaic Power Plant in Pakistan
    Naeem Abas
    Shoaib Rauf
    Muhammad Shoaib Saleem
    Muhammad Irfan
    Suleman Abdul Hameed
    Technology and Economics of Smart Grids and Sustainable Energy, 7
  • [9] A techno-economic analysis of partial repowering of a 210 MW coal fired power plant
    Samanta, Samiran
    Ghosh, Sudip
    ADVANCES IN ENERGY RESEARCH, 2015, 3 (03): : 167 - 179
  • [10] 10 MW Concentrated Solar Power (CSP) plant operated by 100% solar energy: Sizing and techno-economic optimization
    Abaza, Mohamed Ali
    El-Maghlany, Wael M.
    Hassab, Mohammed
    Abulfotuh, Fuad
    ALEXANDRIA ENGINEERING JOURNAL, 2020, 59 (01) : 39 - 47