Evaluate the system reliability for a manufacturing network with reworking actions

被引:33
作者
Lin, Yi-Kuei [1 ]
Chang, Ping-Chen [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
Reworking; System reliability; Manufacturing network; Multistate; Decomposition; STOCHASTIC-FLOW NETWORK; CAPACITY WEIGHT; ALGORITHM; TERMS; NODES;
D O I
10.1016/j.ress.2012.05.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To measure the system reliability of a manufacturing system with reworking actions is a crucial issue in industry, in which the system reliability could be one of the essential performance indicators to evaluate whether the manufacturing system is capable or not. In a manufacturing system, the input flow (raw materials/WIP) processed by each machine might be defective and thus the output flow (WIP/products) would be less than the input amount. Moreover, defective WIP/products are usually incentive to be reworked for reducing wasting and increasing output. Therefore, reworking actions are necessary to be considered in the manufacturing system. Based on the path concept, we revise such a manufacturing system as a stochastic-flow network in which the capacity of each machine is stochastic (i.e., multistate) due to the failure, partial failure, and maintenance. We decompose the network into one general processing path and several reworking paths. Subsequently, three algorithms for different network models are proposed to generate the lower boundary vector which affords to produce enough products satisfying the demand d. In terms of such a vector, the system reliability can be derived afterwards. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:127 / 137
页数:11
相关论文
共 50 条
  • [1] System reliability of a manufacturing network with reworking action and different failure rates
    Lin, Yi-Kuei
    Chang, Ping-Chen
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (23) : 6930 - 6944
  • [2] Reliability assessment for a stochastic manufacturing system with reworking actions
    Lin, Yi-Kuei
    Chang, Ping-Chen
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2013, 36 (03) : 382 - 390
  • [3] EVALUATE THE RELIABILITY OF A SERU PRODUCTION SYSTEM WITH REWORKING ACTIONS
    Zhang, Zhe
    Han, Xinzi
    Song, Xiaoling
    Yin, Yong
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2021, 38 (07) : 475 - 484
  • [4] Performance indicator for a stochastic-flow manufacturing network with reworking actions based on reliability
    Lin, Y. K.
    Chang, P. C.
    SCIENTIA IRANICA, 2013, 20 (06) : 2201 - 2214
  • [5] RELIABILITY EVALUATION OF A MANUFACTURING NETWORK WITH REWORKING ACTION
    Lin, Yi-Kuei
    Chang, Ping-Chen
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2011, 18 (05) : 445 - 461
  • [6] Reliability evaluation for a multi-line production system with reworking actions
    Chang, Ping-Chen
    Lin, Yi-Kuei
    PROCEEDINGS 18TH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY & QUALITY IN DESIGN, 2012, : 55 - 59
  • [7] System reliability evaluation of a touch panel manufacturing system with defect rate and reworking
    Lin, Yi-Kuei
    Huang, Cheng-Fu
    Chang, Ping-Chen
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2013, 118 : 51 - 60
  • [8] RELIABILITY EVALUATION OF A MULTISTATE NETWORK UNDER ROUTING POLICY
    Lin, Yi-Kuei
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2012, 19 (02): : 57 - 67
  • [9] Analysis of advanced manufacturing, system network reliability
    Zhang Xinfeng
    Zhao Yan
    Shi Huli
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PROCEEDINGS, 2007, : 262 - 267
  • [10] Reliability evaluation for a manufacturing network with multiple production lines
    Lin, Yi-Kuei
    Chang, Ping-Chen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (04) : 1209 - 1219