Multiple-objective Optimization for Solving the Resource Allocation Problem

被引:0
作者
Vunjak, Nenad [1 ]
Birovljev, Jelena [1 ]
Sedlak, Otilija [1 ]
Ciric, Zoran [1 ]
机构
[1] Univ Novi Sad, Fac Econ Subotica, Subotica, Serbia
来源
33RD INTERNATIONAL CONFERENCE MATHEMATICAL METHODS IN ECONOMICS (MME 2015) | 2015年
关键词
resource allocation problem; marks given method; PROJECTS; SETS;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Just as in many other areas, project management makes use of mathematical modeling in cases such as setting strategic goals, formulation of strategies, selection of human resources and realization of the chosen strategy and control. Criteria and restrictions of alternatives are also encompassed in the space of uncertainty and indeterminacy. Resource allocation problem (RAP) is the process of allocating resources among the various projects or business units for maximization of profit or minimization of cost. This paper deals with human resource allocation. We start from a set of individuals who were tested for certain qualities by the experts. Marks given by the experts need not to be exact numbers, but qualitative values, such as: absolutely true, highly true, moderately true etc. Methodology which allows us to model indeterminacy is fuzzy sets theory which is particularly well designed for dealing with non-probabilistic uncertainties. We expand the grading system and, indirectly, coefficients of model constraints which become fuzzy.
引用
收藏
页码:906 / 911
页数:6
相关论文
共 20 条
[1]  
[Anonymous], 1995, Fuzzy Sets and Fuzzy Logic: Theory and Applications
[2]   INTERVAL VALUED INTUITIONISTIC FUZZY-SETS [J].
ATANASSOV, K ;
GARGOV, G .
FUZZY SETS AND SYSTEMS, 1989, 31 (03) :343-349
[3]   Human resource allocation management in multiple projects using sociometric techniques [J].
Ballesteros-Perez, P. ;
Gonzalez-Cruz, Ma. C. ;
Fernandez-Diego, M. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (08) :901-913
[4]  
Bellman R. E., 1971, Decision-making in a fuzzy environment, DOI 10.1287/mnsc.17.4.B141
[5]   Decision model for allocating human resources in information system projects [J].
Camara e Silva, Lucio ;
Cabral Seixas Costa, Ana Paula .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (01) :100-108
[6]  
Dubois D., 1980, Fuzzy Sets and Systems, V3, P37, DOI 10.1016/0165-0114(80)90004-4
[7]  
Dubois D., 1987, ANAL FUZZY INFORM, VIII, P241
[8]  
Filho C. F. F. C., 2012, EXPERT SYSTEMS APPL, V39, P385
[9]   Membership function elicitation in possibilistic programming problems [J].
Inuiguchi, M ;
Tanino, T ;
Sakawa, M .
FUZZY SETS AND SYSTEMS, 2000, 111 (01) :29-45
[10]   THE USEFULNESS OF POSSIBILISTIC PROGRAMMING IN PRODUCTION PLANNING PROBLEMS [J].
INUIGUCHI, M ;
SAKAWA, M ;
KUME, Y .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) :45-52