PROCESSING THE MATERIAL REQUIREMENTS PLANNING DATA IN THE EDUCATIONAL ENVIRONMENT

被引:0
作者
Cvetic, Biljana [1 ]
Ilic, Oliver [1 ]
机构
[1] Univ Belgrade, Fac Management Sci, Belgrade 11001, Serbia
来源
METALURGIA INTERNATIONAL | 2013年 / 18卷
关键词
material requirements planning; data processing; educational software; SOFTWARE;
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The paper focuses on the enhancement of processing the material requirements planning (MRP) data with the help of software systems in the educational environment. The capabilities of two leading educational software systems WinQSB and POM-QM for Windows which offer the possibility of processing the MRP data are explored. The outcomes of this work have shown that the WinQSB's MRP module is afar more suitable system than POM-QM for Windows's MRP module and that students had positive experience with the use of it. The results of this study are useful for both academics and practitioners interested in training and education in the field of resource planning.
引用
收藏
页码:95 / 100
页数:6
相关论文
共 14 条
[1]   WinQSB simulation software - a tool for professional development [J].
Amariei, Olga Ioana ;
Frunzaverde, Doina ;
Popovici, Gheorghe ;
Hamat, Codruta Oana .
WORLD CONFERENCE ON EDUCATIONAL SCIENCES - NEW TRENDS AND ISSUES IN EDUCATIONAL SCIENCES, 2009, 1 (01) :2786-2790
[2]  
Ammar S., 1999, International Transactions in Operational Research, V6, P183, DOI 10.1111/j.1475-3995.1999.tb00150.x
[3]  
Bucur A, 2012, METAL INT, V17, P187
[4]  
Chang Y., 1986, QSB QUANTITATIVE SYS
[5]  
Chang Y.-L., 2003, WinQSB: Software and Manual
[6]  
Heizer J., 2010, Operations Management, V10th
[7]  
Ilic O., 2003, FACULTY MANAGEMENT S
[8]  
Ilic O, 2012, METAL INT, V17, P58
[9]   Using Computer Software Packages to Enhance the Teaching of Engineering Management Science: Part 1-Critical Path Networks [J].
Ku, H. ;
Fulcher, R. ;
Xiang, W. .
COMPUTER APPLICATIONS IN ENGINEERING EDUCATION, 2011, 19 (01) :26-39
[10]   Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint [J].
Louly, Mohamed-Aly ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :35-40