Static Analysis of Loading Properties of Small-size Single-pylon Cable-stayed Bridge

被引:1
|
作者
Li, Fenglan [1 ]
Zhao, Yanhong [1 ]
Liu, Shiming [1 ]
机构
[1] North China Univ Water Conservancy & Hydroelect P, Sch Civil Engn & Commun, Zhengzhou 450011, Henan Province, Peoples R China
来源
ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION III, PTS 1 AND 2 | 2012年 / 201-202卷
关键词
Cable-stayed bridge; Single-pylon; Small-size; Prestressed concrete box girder; Design;
D O I
10.4028/www.scientific.net/AMM.201-202.296
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper introduces the design of a small-size single-pylon cable-stayed bridge to be built in Xingtai city, China. The main structural members of this bridge including box-girder, stayed cables and pylon were selected to meet the requirement of bearing properties and artistic display. The numerical model for analyzing the static properties of the bridge structure was made by the design software MIDAS/Civil. The distribution and ultimate value of internal forces, stress and displacement of these main members are summarized, which provide the basis for calculating the reinforcement and prestressed strands of the bridge.
引用
收藏
页码:296 / 299
页数:4
相关论文
共 50 条
  • [31] Performance of cable-stayed bridge pylons subjected to blast loading
    Son, Jin
    Lee, Ho-Jung
    ENGINEERING STRUCTURES, 2011, 33 (04) : 1133 - 1148
  • [32] A Practical Longitudinal Buckling Analysis Method of Spatial Diamond-Shaped Pylon Cable-Stayed Bridge
    Zheng, Xing
    Huang, Qiao
    Zheng, Qing-Gang
    Shen, Kong-Jian
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2023, 23 (09)
  • [33] Dynamic Characteristics of Pylon of Cable-stayed Bridge with Inclined and Arched Tower During Construction
    Li, Zi-lin
    Xue, Jiang
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1547 - 1551
  • [34] Method to Optimize Hoop Prestressing Tendons in Cable-Pylon Anchorage Zones of Cable-Stayed Bridge
    Peng J.
    Xue K.
    Zhang H.
    Bao C.
    Zhang Z.
    Bridge Construction, 2024, 54 (02) : 57 - 63
  • [35] METHOD OF REASONABLE FINISHED STATE OF CONCRETE INCLINED PYLON CABLE-STAYED BRIDGE WITH BACKSTAYS
    Jiang, De-Zeng
    Wang, Rong-Hui
    Ma, Niu-Jing
    ISISS '2009: INNOVATION & SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2009, : 912 - 918
  • [36] Full-scale Model Test for Anchorage Zone of Pylon of Cable-stayed Bridge
    Yu, Xiaolin
    Jia, Buyu
    Wang, Weifeng
    Yan, Quansheng
    INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 728 - 732
  • [37] Stress Sensitivity Factors in Stay Cable-Pylon Anchorage Zone of an Irregular Cable-Stayed Bridge
    Li J.-G.
    Yang B.
    Bridge Construction, 2023, 53 (03) : 64 - 70
  • [38] Stay Cable Tubes Positioning Control of Prestressed Concrete Low-pylon Cable-stayed Bridge
    Wang, Hao
    Chi, Yanbin
    Li, Yalin
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1971 - 1975
  • [39] Study on Placement of U Tendons in Box-section Pylon of Cable-stayed Bridge
    Tang, Hongyuan
    Meng, Shaoping
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 901 - +
  • [40] Experimental study on optimal layout of tendons in anchorage zone of cable-stayed bridge pylon
    Meng, Shaoping
    Tang, Hongyuan
    Jiang, Zhusheng
    Liu, Shitong
    ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 352 - 362