Stability Control of the Equipment Recovery Passage in a Fully Mechanized Longwall Mining: Case Study

被引:2
|
作者
Zhang, Zhiyi [1 ]
Chen, Hui [1 ]
Li, Dongfa [2 ]
Zhang, Zhiqiang [1 ]
机构
[1] Xinjiang Univ, Coll Geol & Min Engn, Urumqi 830047, Peoples R China
[2] Hefeng Coal & Elect Co Shenhua Grp, Shajihai Coalmine, Tacheng 834411, Peoples R China
关键词
Equipment recovery passage (ERP); Longwall face moving velocity (LFMV); Stability control; Longwall mining; FLAC3D numerical simulation;
D O I
10.1007/s10706-020-01522-z
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Equipment recovery passage (ERP) is being widely employed in longwall panel for the purpose of recovering heave mining equipment at the end of mining stage. The stability of the ERP, however, is always difficult to control although powerful supporting structures are employed, which restricts its further promotion. In the present paper, we focused on the ERP's stability control through reducing the abutment stress imposed on the ERP's surroundings rather than solely increasing roadway support intensity, based on a rigorous case study in China. First, the dynamic evolution of the abutment stresses, corresponding plastic zone and deformations in the surrounding rock of the ERP were analyzed through a meticulously validated FLAC3D numerical simulation, as the longwall face moved with different velocity. The simulated results indicate that the faster the longwall face moved, the lower the abutment stresses, the narrower the plastic zone and the smaller the deformations were. In terms of these analyses, two suggestions were proposed, including increasing longwall face moving velocity and roof structure optimization, and corresponding technologies were introduced, and potential effect were verified as well. Conclusions and suggestions of this paper might be helpful for increasing the flexibility of the ERP in similar geotechnical conditions.
引用
收藏
页码:799 / 813
页数:15
相关论文
共 50 条
  • [1] Stability Control of the Equipment Recovery Passage in a Fully Mechanized Longwall Mining: Case Study
    Zhiyi Zhang
    Hui Chen
    Dongfa Li
    Zhiqiang Zhang
    Geotechnical and Geological Engineering, 2021, 39 : 799 - 813
  • [2] Fully mechanized longwall mining with two shearers: A case study
    Yuan, Y.
    Liu, H.
    Tu, S.
    Wei, H.
    Chen, Z.
    Jia, M.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (10) : 1079 - 1086
  • [3] Fully Mechanized Longwall Mining in an Underground Bauxite Deposit: A Case Study
    Wang S.
    Li X.
    Geotechnical and Geological Engineering, 2018, 36 (2) : 1231 - 1248
  • [4] Study on match technology for fully mechanized longwall coal mining face
    Xu, Gang
    Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1921 - 1924
  • [5] Analysis and control of hydraulic support stability in fully-mechanized longwall face to the dip with great mining height
    华心祝
    王家臣
    International Journal of Coal Science & Technology, 2008, (03) : 399 - 402
  • [6] PIONEERING OF FULLY MECHANIZED LONGWALL COAL MINING IN SOUTH AFRICA
    NAUDE, RT
    DEATS, MJ
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1967, 67 (07): : 322 - &
  • [7] PIONEERING OF FULLY MECHANIZED LONGWALL COAL MINING IN SOUTH AFRICA
    NAUDE, RT
    DEATS, MJ
    FOURIE, JC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1967, 67 (11): : 621 - &
  • [8] Several problems of the old mining remnants in longwall fully mechanized mining technology
    Xu, Zhong-He
    Zhao, Yang-Sheng
    Gao, Hong-Bo
    Gong, Pei-Lin
    Meitan Xuebao/Journal of the China Coal Society, 2015, 40 : 33 - 39
  • [9] Structural characteristics of strata overlying of a fully mechanized longwall face: a case study
    Wang, J.
    Ning, J.
    Jiang, L.
    Jiang, J-Q
    Bu, T.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2018, 118 (11) : 1195 - 1204
  • [10] Method for determining the load on and width of coal pillar at the recovery room end of fully-mechanized longwall mining
    Gu, Shuancheng
    Wang, Bonan
    Huang, Rongbin
    Miao, Yanping
    Zhongguo Kuangye Daxue Xuebao/Journal of China University of Mining and Technology, 2015, 44 (06): : 990 - 995