Comprehensive decision-making approach for managing time dependent dam risks

被引:8
作者
Fluixa-Sanmartin, Javier [1 ]
Escuder-Bueno, Ignacio [2 ,3 ]
Morales-Torres, Adrian [3 ]
Tamara Castillo-Rodriguez, Jesica [2 ]
机构
[1] Ctr Rech Environm Alpin CREALP, CH-1951 Sion, Switzerland
[2] Univ Politecn Valencia UPV, Inst Univ Invest Ingn Agua & Medio Ambiente, Valencia 46022, Spain
[3] iPresas Risk Anal, Valencia 46023, Spain
关键词
Dam safety management; Decision-making; Long term; Climate change; Risk reduction; CLIMATE-CHANGE IMPACTS; IRRIGATION WATER REQUIREMENTS; COST-BENEFIT-ANALYSIS; RELIABILITY-ANALYSIS; CRITERIA; SAFETY; MANAGEMENT; FAILURE; LOSSES; LIFE;
D O I
10.1016/j.ress.2020.107100
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Dams are critical infrastructures whose safety must be properly managed. Traditional decision-making approaches often assume the stationarity of factors defining risk. However, dam risk is susceptible to evolve with time. Risk can no longer be considered a static but a time-dependent concept which cumulative value must be reduced for different timescales. A broader perspective to dynamically evaluate time issues in the prioritization of measures is thus required. A new approach is proposed for dam risk management in the long term that considers the potential evolution of risk. A new time-dependent risk indicator that allows assessing the efficiency of adaptation measures in optimally reducing dam risks has been defined: the Aggregated Adjusted Cost per Statistical Life Saved (AACSLS). Its use makes it possible to better design risk reduction measures and to plan the implementation sequence that maximizes their effectiveness. The methodology has been applied to the case study of a Spanish dam under the effects of climate change. Different risk reduction measures have been proposed and their effects have been analyzed for a specific time horizon. The use of the AACSLS indicator has allowed identifying the prioritization of measures that optimizes the allocation of economic resources in the long term.
引用
收藏
页数:11
相关论文
共 71 条
  • [1] Cost-benefit analysis (CBA), or multi-criteria decision-making (MCDM) or both: politicians' perspective in transport policy appraisal
    Annema, Jan Anne
    Mouter, Niek
    Razaei, Jafar
    [J]. 18TH EURO WORKING GROUP ON TRANSPORTATION, EWGT 2015, 2015, 10 : 788 - 797
  • [2] [Anonymous], EFF CLIM CHANG FED H
  • [3] [Anonymous], 2003, B RISK ASS DAM SAF M
  • [4] [Anonymous], 2014, QUANT SCEN CLIM CHAN
  • [5] [Anonymous], 2003, Guidelines on Risk Assessment
  • [6] Ardiles L., 2011, P 6 INT C DAM ENG P 6 INT C DAM ENG
  • [7] RISK OF DAM FAILURE IN BENEFIT-COST-ANALYSIS
    BAECHER, GB
    PATE, ME
    DENEUFVILLE, R
    [J]. WATER RESOURCES RESEARCH, 1980, 16 (03) : 449 - 456
  • [8] Benjamin J. R., 1982, STRUCT SAF, V1, P257
  • [9] Beria P., 2012, European Transport Research Review, V4, P137, DOI DOI 10.1007/S12544-012-0074-9
  • [10] HAVE DISASTER LOSSES INCREASED DUE TO ANTHROPOGENIC CLIMATE CHANGE?
    Bouwer, Laurens M.
    [J]. BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 2011, 92 (01) : 39 - +