Electrical and Control Technology of the Hydropower Plant Rheinfelden

被引:1
作者
Ficht, Stefan [1 ]
机构
[1] Energiedienst Holding AG, CH-5080 Laufenburg, Switzerland
关键词
D O I
10.1365/s35147-013-0594-9
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
In the concessions for the new power plant, one specification is that the energy generated must be fed in equal measure to the German and Swiss grids. For this reason, energy transmission was provided into Switzerland and Germany. The two grids may not be connected to each other, however. Since all processes are equipped with control and regulation systems, the power plant can be operated fully automatically.