共 50 条
- [1] Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1214 - 1221
- [2] Water-gas shift (WGS) operation of pre-combustion CO2 capture pilot plant at the Buggenum IGCC 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 2008 - 2015
- [4] Optimisation of pre-combustion capture for IGCC with a focus on the water balance 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1176 - 1183
- [7] Pre-combustion CO2 capture for IGCC plants by an adsorption process GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01): : 655 - 660
- [8] Process simulation of a dual-stage Selexol unit for pre-combustion carbon capture at an IGCC power plant 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 1751 - 1755
- [10] INTEGRATION AND PERFORMANCE ASSESSMENT OF HYDROGEN FIRED COMBINED CYCLE POWER PLANT WITH PSA PROCESS FOR CO2 CAPTURE IN A PRE-COMBUSTION IGCC POWER PLANT PROCEEDINGS OF THE ASME GAS TURBINE INDIA CONFERENCE 2012, 2012, : 773 - 786