Model-based evaluation of a new upgrading concept for N-removal

被引:37
作者
Salem, S
Berends, D
Heijnen, JJ
van Loosdrecht, MCM
机构
[1] Delft Univ Technol, Kluyver Lab Biotechnol, NL-2628 BC Delft, Netherlands
[2] DHV Water BV, NL-3800 AL Amersfoort, Netherlands
关键词
BABE concept; bio-augmentation; modelling; nitrification; upgrading of a treatment plant;
D O I
10.2166/wst.2002.0104
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Mathematical modelling is considered a time and cost-saving tool for evaluation of new wastewater treatment concepts. Modelling can help to bridge the gap between lab and full-scale application. Bio-augmentation can be used to obtain nitrification in activated sludge systems with a limited aerobic sludge retention time, In the present study the potential for augmenting the endogenous nitrifying population is evaluated. Implementing a nitrification reactor in the sludge return line fed with sludge liquor with a high ammonia concentration leads to augmentation of the native nitrifying population. Since the behaviour of nitrifiers is relatively well known, a choice was made to evaluate this new concept mainly based on mathematical modelling. As an example an existing treatment plant (WWTP Walcheren, The Netherlands) that needed to be upgraded was used. A mathematical model, based on the TUDP model and implemented in AQUASIM was developed and used to evaluate the potential of this bioaugmentation in the return sludge line. A comparison was made between bio-augmentation and extending the existing aeration basins and anoxic tanks. The results of both modified systems were compared to give a quantitative basis for evaluation of benefits gained from such a system. If the plant is upgraded by conventional extension it needs an increase in volume of about 225%; using a bioaugmentation in the return sludge line the total volume of the tanks needs to be expanded by only 75% (including the side stream tanks). Based on the modelling results a decision was made to implement the bioaugmentation concept at full scale without further pilot scale testing, thereby strongly decreasing the scale-up period for this process.
引用
收藏
页码:169 / 176
页数:8
相关论文
共 12 条
  • [1] BIOLOGICAL FIXED-FILM SYSTEMS
    CHEN, JM
    HAO, OJ
    ALGHUSAIN, IA
    LIN, CF
    [J]. WATER ENVIRONMENT RESEARCH, 1995, 67 (04) : 450 - 459
  • [2] HAO X, 2001, ENV ENG, V127, P112
  • [3] The SHARON process: An innovative method for nitrogen removal from ammonium-rich waste water
    Hellinga, C
    Schellen, AAJC
    Mulder, JW
    van Loosdrecht, MCM
    Heijnen, JJ
    [J]. WATER SCIENCE AND TECHNOLOGY, 1998, 37 (09) : 135 - 142
  • [4] HENZE M, 1987, 1 IAWQ IAWPRC
  • [5] Metabolic modelling of full-scale biological nitrogen and phosphorus removing WWTP's
    Meijer, SCF
    Van Loosdrecht, MCM
    Heijnen, JJ
    [J]. WATER RESEARCH, 2001, 35 (11) : 2711 - 2723
  • [6] How input active biomass affects sludge age and process stability
    Rittmann, BE
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1996, 122 (01): : 4 - 8
  • [7] ROELEVELD PJ, 1998, KORRESPONDENZ ABWASS, V45, P465
  • [8] SALEM S, 2001, UNPUB WAT RES
  • [9] Tanaka K, 1996, PROGR BIOTECHNOL, V11, P622
  • [10] YANG L, 1997, WAT SCI TECH, V35