共 35 条
[1]
Allen S. J., 1990, Production and Inventory Management Journal, V31, P24
[3]
Bomberger E. E., 1966, MANAGE SCI, V12, P778, DOI DOI 10.1287/MNSC.12.11.778
[6]
ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (01)
:50-55
[8]
GALLEGO G, 1992, NAV RES LOG, V39, P729, DOI 10.1002/1520-6750(199208)39:5<729::AID-NAV3220390510>3.0.CO
[9]
2-N
[10]
Complexity of the ELSP with general cyclic schedules
[J].
IIE TRANSACTIONS,
1997, 29 (02)
:109-113