An improved multi-objective grey wolf optimization algorithm for fuzzy blocking flow shop scheduling problem

被引:0
|
作者
Yang, Zhi [1 ]
Liu, Cungen [1 ]
Qin, Weixin [1 ]
机构
[1] Shanghai Jiao Tong Univ, State Kay Lab Ocean Engn, Shanghai, Peoples R China
来源
2017 IEEE 2ND ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC) | 2017年
关键词
blocking flow shop; fuzzy scheduling problem; grey wolf optimization; multi-objective optimization; MACHINE;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper formulates a bi-criteria fuzzy blocking flow shop scheduling problem with fuzzy processing time and fuzzy due date. An improved multi-objective grey wolf optimization (MOGWO) algorithm is proposed to solve this combinational optimization problem. The proposed MOGWO utilizes the ranked-order-value (ROY) rule for solution representation, employs a dynamic maintenance strategy to maintain archive, and develops a thorough mechanism for leader selection. In addition, to improve the performance of the neighborhood search, a VNS structure with three randomly ranked neighborhood search operators is introduced and implemented on the members of archive that may become the selected leaders. The proposed MOGWO is tested on a fuzzy blocking flow shop scheduling problem of panel block construction, and is compared with general MOGWO and multi objective particle swarm optimization (MOPSO). Computational results suggest that the proposed MOGWO is superior to the compared algorithms in terms of the convergence, spread and coverage of the optimal solutions. This demonstrates the feasibility and effectiveness of the proposed MOGWO.
引用
收藏
页码:661 / 667
页数:7
相关论文
共 50 条
  • [1] A hybrid multi-objective gray wolf optimization algorithm for a fuzzy blocking flow shop scheduling problem
    Yang, Zhi
    Liu, Cungen
    ADVANCES IN MECHANICAL ENGINEERING, 2018, 10 (03):
  • [2] A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem
    Shao, Zhongshi
    Pi, Dechang
    Shao, Weishi
    EXPERT SYSTEMS WITH APPLICATIONS, 2018, 113 : 77 - 99
  • [3] A Multi-Objective Memetic Algorithm for a Fuzzy Parallel Blocking Flow Shop Scheduling Problem of Panel Block Assembly in Shipbuilding
    Yang, Zhi
    Liu, Cungen
    Zhang, Shuiming
    Shi, Jun
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2019, 35 (02): : 170 - 181
  • [4] Improved grey wolf optimization for solving hybrid flow shop scheduling problem
    Shi W.
    Song C.
    Song, Cunli (scunli@163.com), 1600, CIMS (27): : 3196 - 3208
  • [5] A MULTI-OBJECTIVE HYBRID DIFFERENTIAL OPTIMIZATION ALGORITHM FOR FLOW-SHOP SCHEDULING PROBLEM
    Pei, J. Y.
    Shan, P.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (03) : 500 - 509
  • [6] A novel multi-objective discrete water wave optimization for solving multi-objective blocking flow-shop scheduling problem
    Shao, Zhongshi
    Pi, Dechang
    Shao, Weishi
    KNOWLEDGE-BASED SYSTEMS, 2019, 165 : 110 - 131
  • [7] An improved multi-objective whale optimization algorithm for the hybrid flow shop scheduling problem considering device dynamic reconfiguration processes
    Yankai, Wang
    Shilong, Wang
    Dong, Li
    Chunfeng, Shen
    Bo, Yang
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 174
  • [8] Multi-Objective Memetic Search Algorithm for Multi-Objective Permutation Flow Shop Scheduling Problem
    Li, Xiangtao
    Ma, Shijing
    IEEE ACCESS, 2016, 4 : 2154 - 2165
  • [9] Interval multi-objective grey wolf optimization algorithm based on fuzzy system
    Lin, Youping
    INTERNATIONAL JOURNAL OF INTELLIGENT COMPUTING AND CYBERNETICS, 2023, 16 (04) : 823 - 846
  • [10] Improved NSGA- II algorithm for hybrid flow shop scheduling problem with multi-objective
    Song C.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (06): : 1777 - 1789