ANALYSIS OF TIMED PETRI NETS FOR REACHABILITY IN CONSTRUCTION APPLICATIONS

被引:2
作者
Nassar, Khaled [1 ]
Casavant, Albert [2 ]
机构
[1] Amer Univ Cairo, Dept Construct & Architectural Engn, Cairo 11511, Egypt
[2] Univ Maryland Eastern Shore, Dept Math & Comp Sci, Princess Anne, MD 21853 USA
关键词
Timed Petri nets; activity cycle diagrams; simulation; construction; reachability;
D O I
10.3846/1392-3730.2008.14.16
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Petri nets have been used for many years to model complex processes. Examples are software design, workflow management, data analysis, concurrent programming, reliability engineering, real-time computing systems, operating systems, distributed systems. and biological processes. Timed petri nets enable the study of timed process reachability, i.e. can a certain state in the process be reached, given an initial state of TPN representing a given process. This paper shows how the reachability of TPN can be utilized to analyze several aspects of construction projects. TPN are introduced and contrasted to Activity Cycle Diagrams and are also formalized to allow for the reachability problem to be assessed. the benefits and limitations of the analysis are presented through the classic earth-moving problem.
引用
收藏
页码:189 / 198
页数:10
相关论文
共 25 条
[21]   Modeling and analysis of concrete production plant using petri nets [J].
Sawhney, A ;
Abudayyeh, O ;
Chaitavatputtiporn, T .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1999, 13 (03) :178-186
[22]  
Seppanen O., 2005, P INT GROUP LEAN CON, P263
[23]   Management Petri net - A modelling tool for management systems [J].
Shih, HM ;
Leung, CKH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (06) :1665-1680
[24]   Petri nets for simulation and modeling of construction systems [J].
Wakefield, RR ;
Sears, GA .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (02) :105-112
[25]   Cell-based representation and analysis of spatial resources in construction simulation [J].
Zhang, Cheng ;
Hammad, Amin ;
Zayed, Tarek M. ;
Wainer, Gabriel ;
Pang, Hong .
AUTOMATION IN CONSTRUCTION, 2007, 16 (04) :436-448