共 50 条
- [2] Verification of the James Webb Space Telescope Integrated Science Instrument Module Cryogenic Structural Alignment Requirements via Photogrammetry OPTICAL SYSTEM ALIGNMENT AND TOLERANCING II, 2008, 7068
- [3] James Webb Space Telescope System Cryogenic Optical Test Plans CRYOGENIC OPTICAL SYSTEMS AND INSTRUMENTS XIII, 2011, 8150
- [5] New approach to cryogenic optical testing the James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION I: OPTICAL, INFRARED, AND MILLIMETER, PTS 1 AND 2, 2006, 6265
- [7] Hartmann Test for the James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION 2016: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2016, 9904
- [8] Science with the James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION I: OPTICAL, INFRARED, AND MILLIMETER, PTS 1 AND 2, 2006, 6265
- [9] The James Webb Space Telescope Mission FIRST STARS AND GALAXIES: CHALLENGES FOR THE NEXT DECADE, 2010, 1294 : 1 - 8
- [10] Measuring the cryogenic optical alignment between the telescope element and the instruments module of the James Webb Space Telescope UV/OPTICAL/IR SPACE TELESCOPES AND INSTRUMENTS: INNOVATIVE TECHNOLOGIES AND CONCEPTS V, 2011, 8146