Probabilistic Security-Constrained Unit Commitment With Generation and Transmission Contingencies

被引:45
作者
Fernandez-Blanco, Ricardo [1 ]
Dvorkin, Yury [1 ]
Ortega-Vazquez, Miguel A. [1 ]
机构
[1] Univ Washington, Dept Elect Engn, Seattle, WA 98105 USA
关键词
Cost/benefit analysis; generation and transmission contingencies; probabilistic unit commitment (UC); reserve requirement; SPINNING RESERVE REQUIREMENTS; WIND POWER-GENERATION; CRITERION; ENERGY;
D O I
10.1109/TPWRS.2016.2550585
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
System operators maintain sufficient reserve in power systems in order to respond to generation and transmission contingencies. Traditionally, the reserve requirements have been determined using deterministic criteria (e.g., N - 1). These amounts of reserve allocate sufficient spare generation capacity and transmission margins to protect the system against any contingency of magnitude lower or equal to the chosen criterion. However, these criteria ignore the probability of individual contingencies as well as energy redistribution and transmission limitations in post-contingency states. In this paper, we propose to optimize the amount, location, and chronological procurement of the reserve in a given power system using probabilistic criteria. The proposed approach factors the probability of individual contingencies in a cost/benefit analysis, which balances the pre-contingency operating costs against the post-contingency cost of interruptions. The effectiveness of the proposed approach is demonstrated using a modified IEEE Reliability Test System.
引用
收藏
页码:228 / 239
页数:12
相关论文
共 45 条
[1]   Probabilistic Spinning Reserve Provision Model in Multi-Control Zone Power System [J].
Ahmadi-Khatir, Ali ;
Bozorg, Mokhtar ;
Cherkaoui, Rachid .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2819-2829
[2]   Optimization-Based Approach for Price Multiplicity in Network-Constrained Electricity Markets [J].
Alguacil, Natalia ;
Arroyo, Jose M. ;
Garcia-Bertrand, Raquel .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) :4264-4273
[3]   Unit Commitment With Probabilistic Spinning Reserve and Interruptible Load Considerations [J].
Aminifar, Farrokh ;
Fotuhi-Firuzabad, Mahmud ;
Shahidehpour, Mohammad .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) :388-397
[4]  
[Anonymous], 1984, Power Generation Operation and Control
[5]  
[Anonymous], 2010, NRELSR5DOO62906
[6]  
[Anonymous], P 2015 IEEE POWERTEC
[7]  
BEALE E. M. L., 1970, P 5 INT C OP RES, P447
[8]  
Billinton R., 1994, RELIABILITY EVALUATI, DOI DOI 10.1007/978-1-4615-7731-7
[9]  
Billinton R, 2013, Reliability assessment of electrical power systems using Monte Carlo methods
[10]   Market-clearing with stochastic security - Part II: Case studies [J].
Bouffard, F ;
Galiana, FD ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :1827-1835