public-private partnership projects; escalation of commitment; real option theory; threshold; abandonment option; early termination pricing; PUBLIC-PRIVATE PARTNERSHIPS; MINIMUM REVENUE GUARANTEE; SUNK-COST; DE-ESCALATION; GOVERNMENT GUARANTEES; INFORMATION ASYMMETRY; ANTICIPATED REGRET; SOFTWARE PROJECTS; HIGHWAY PROJECTS; FAILING COURSE;
D O I
10.3846/ijspm.2020.13120
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Escalation of commitment (EOC) is a common behavior among investors who receive negative feedback (NF) in public-private partnership (PPP) projects, and this behavior typically leads to sizable losses. Recognizing this, investors set a mental threshold and track investments for escalation. Once losses reach the threshold, investors will terminate the escalation behavior, namely, they will transfer projects to governments to obtain compensation or residual asset value. This paper analyzes the maximum amount of NF that investors can sustain based on a belief-adjustment model, followed by the analysis of the greatest loss degree. Then, a threshold model for EOC is constructed using real option thinking. Different from the usual judgment criteria of the traditional option method, the threshold is less than zero in the EOC scenario. The results show that the threshold correlates with the initial generative cognition, the sunk cost level, the degree of the government guarantee and investors' behavioral preferences as well as with total investment and return on investment. These findings serve as a reference for governments to de-escalate investors' commitment in PPP projects.
引用
收藏
页码:348 / 364
页数:17
相关论文
共 7 条
  • [1] Investors' exit timing of PPP projects based on escalation of commitment
    Wang, Yinglin
    Chen, Jingyi
    Liu, Jicai
    Zhou, Chuhan
    PLOS ONE, 2021, 16 (09):
  • [2] Evaluation of restrictive competition in PPP projects using real option approach
    Liu, Jicai
    Yu, Xibing
    Cheah, Charles Yuen Jen
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) : 473 - 481
  • [3] Evaluating Demand Guarantee for PPP Projects by Real-Option Pricing
    Chu, Xiaoling
    Wang, Shouqing
    Feng, Ke
    ICCREM 2017: PREFABRICATED BUILDINGS, INDUSTRIALIZED CONSTRUCTION, AND PUBLIC-PRIVATE PARTNERSHIPS, 2017, : 155 - 162
  • [4] Forecasting the Investors' Escalation of Commitment in PPP Project at Different Project Stages: A Regression Model Based on the Influence of Social Factors
    Liu, Jiaqi
    Liu, Jicai
    Hu, Jun
    ENGINEERING MANAGEMENT JOURNAL, 2024, 36 (01) : 30 - 41
  • [5] Investigation of the relationship between real option method and escalation of commitment in capital budgeting
    Farsani, Farshid Ahmadi
    LIFE SCIENCE JOURNAL-ACTA ZHENGZHOU UNIVERSITY OVERSEAS EDITION, 2012, 9 (03): : 2094 - 2099
  • [6] Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory
    Liu, Jicai
    Gao, Ruolan
    Cheah, Charles Yuen Jen
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (06)
  • [7] Identifying escalation of commitment in B2B new product development projects using data envelopment analysis
    Donthu, Naveen
    Unal, Belgin
    JOURNAL OF BUSINESS & INDUSTRIAL MARKETING, 2014, 29 (03) : 209 - 214