Advanced planning and scheduling for TFT-LCD color filter fab with multiple lines

被引:8
作者
Chen, James C. [1 ]
Huang, PoTsang B. [2 ]
Wu, Ji-Geng [3 ]
Lai, Ken Y. [3 ]
Chen, Chih-Cheng [4 ]
Peng, Tzu-Wei [4 ]
机构
[1] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu, Taiwan
[2] Chung Yuan Christian Univ, Dept Ind & Syst Engn, Tao Yuan, Taiwan
[3] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[4] Chunghwa Picture Tubes Ltd, Tao Yuan, Taiwan
关键词
Scheduling; Advanced planning and scheduling; Color filter; TFT-LCD; PRODUCT MIX; CAPACITY; SETUP; SIMULATION;
D O I
10.1007/s00170-013-4757-8
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Intense global competition and declining profit have caused most thin film transistor liquid crystal display manufacturers to increase their competitiveness by improving productivity and reducing cycle times. An advanced planning and scheduling (APS) system was developed with Microsoft Visual Basic for Application to automatically generate production schedules for a color filter fab with multiple lines. This system can assign orders to production lines, plan order release time, and balance the equipment loading. Both forward scheduling and backward scheduling were used in APS. Experimental results indicated that APS can significantly reduce manual scheduling time while maintaining the quality of scheduling results. Compared to manual operations, it can save more than 87 % of scheduling time and the quickness is especially important when rescheduling is needed due to production uncertainties such as equipment breakdown or material shortage. Production controllers can use this APS to generate initial schedule and make adjustment based on experience.
引用
收藏
页码:101 / 110
页数:10
相关论文
共 28 条
[1]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[2]  
Chen JC, 2009, 2009 SID INTERNATIONAL SYMPOSIUM DIGEST OF TECHNICAL PAPERS, VOL XL, BOOKS I - III, P1309
[3]   Capacity improvement for color-filter fabs through computer modeling and iterative simulation [J].
Chen, James C. ;
Su, Ling-Huey ;
Chao, Gary C. ;
Chen, Chih-Cheng ;
Peng, Tzu-Wei .
JOURNAL OF THE SOCIETY FOR INFORMATION DISPLAY, 2011, 19 (07) :480-487
[4]  
Chen JC, 2010, KEY ENG MATER, V419-420, P637
[5]   Capacity requirements planning for twin Fabs of wafer fabrication [J].
Chen, James C. ;
Fan, Yang-Chih ;
Chen, Chia-Wen .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (16) :4473-4496
[6]   Capacity planning with capability for multiple semiconductor manufacturing fabs [J].
Chen, JC ;
Chen, CW ;
Lin, CJ ;
Rau, H .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) :709-732
[7]   OPTIMAL SCHEDULING IN COLOR FILTER MANUFACTURING [J].
Chen, Shyh-Huei ;
Chang, Chih-Kai ;
Kuo, Che-Liang .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2005, 22 (04) :301-308
[8]   Multi-tier and multi-site collaborative production: Illustrated by a case example of TFT-LCD manufacturing [J].
Chen, Wu-Lin ;
Huang, Chin-Yin ;
Lai, Yin-Chieh .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (01) :61-72
[9]   Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry [J].
Chen, Yin-Yann ;
Chen, Tzu-Li ;
Liou, Cheng-Dar .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (9-12) :1213-1230
[10]   Order assignment and scheduling in a supply chain [J].
Chen, ZL ;
Pundoor, G .
OPERATIONS RESEARCH, 2006, 54 (03) :555-572