共 50 条
- [41] Optimization of Construction Process of Double Side Slope Method Used in Super Section Tunnel PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ICEESD 2017), 2017, 129 : 189 - 192
- [43] Experimental study and prediction on large section tunnel construction deformation of surrounding rock in soft ground Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2016, 35 : 4029 - 4039
- [44] Construction mechanics of tunnel with super-large cross-section and its dynamic stability Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (07): : 1023 - 1029
- [45] Construction monitoring analysis for large cross-section tunnel excavation of passenger dedicated railway Beijing Gongye Daxue Xuebao/Journal of Beijing University of Technology, 2010, 36 (10): : 1350 - 1356
- [47] ANALYSIS ON CONSTRUCTION MONITORING OF LARGE-SECTION HIGHWAY TUNNEL WITH ULTRA-SMALL SPACING PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1001 - 1005
- [48] Numerical simulation analysis of the construction process of a large-span variable-section tunnel 2021 2ND INTERNATIONAL CONFERENCE ON BIG DATA & ARTIFICIAL INTELLIGENCE & SOFTWARE ENGINEERING (ICBASE 2021), 2021, : 112 - 115
- [49] Study on Construction Time of Secondary Lining for Large Section Shallow Buried Tunnel in Soft Rock 2016 INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2016, : 290 - 293