共 50 条
- [33] Sand Deposit Arrangement and Construction Optimization for Large-section Immersed Tube Tunnel Foundations via the Sand Flow Method Soil Mechanics and Foundation Engineering, 2017, 54 : 324 - 329
- [39] Excavation Method Comparison and Optimization for a Super Large Cross-Section Tunnel APPLIED SCIENCES-BASEL, 2024, 14 (15):
- [40] Construction technique for the shallow-buried subway tunnel with large-section by long-distance horizontal ground freezing method and undermining method Zhongguo Tiedao Kexue/China Railway Science, 2011, 32 (01): : 75 - 80