Private Railway organizations, like Rhaetian Railway (RhB), operate more than 50 km of tunnels aged more than 100 years. Refurbishment of those tunnels has to happen during the short period of night break. RhB developed a standardized system and tested this at Hagerbach Test Gallery to prove the concept and eliminate weaknesses before applying the system at their tunnel net. The main idea is to decentralize the working process by prefabrication of elements - a kind of segmental lining - which will be put in place during the night break. Also the machinery equipment to handle all the operations had have to be developed to realize an effective and mobile equipment which makes the maximum use of the night break. About 9 m tunnel lining can be refurbished per night with this procedure. For the evaluation process Hagerbach Test Gallery excavated a section of 40 m of tunnel with the shape of an old narrow railway tunnel. In this section the cycle of the refurbishment of tunnel composed of the steps removing the existing lining, temporary support, installation drainage, preparing for placing of elements, the placing of the elements itself and backfilling them was tested and trained with the contractor who will do the work.
引用
收藏
页码:505 / 511
页数:7
相关论文
共 50 条
[31]   Building the Channel Tunnel Rail Link [J].
Jago, CT .
RAILWAY INFRASTRUCTURE, 2001, 2001 (03) :125-131
[33]   Innovative wagons boost rail freight [J].
不详 .
PROFESSIONAL ENGINEERING, 1997, 10 (13) :8-8
[34]   Innovative speed sensors in rail vehicles [J].
Hilger, Gernot .
eb - Elektrische Bahnen, 2006, 104 (04) :171-176
[35]   Modelling of an Innovative Rail Conveyor System [J].
Abayasekara, R. P. ;
Zhang, Y. ;
Wheeler, Craig ;
Kulasekera, A. L. .
2016 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION FOR SUSTAINABILITY (ICIAFS): INTEROPERABLE SUSTAINABLE SMART SYSTEMS FOR NEXT GENERATION, 2016,
[36]   MONTANUNI LEOBEN "Innovative Rail System" [J].
Kotschan, Micha .
ELEKTROTECHNIK UND INFORMATIONSTECHNIK, 2005, 122 (05) :A20-A20
[37]   INNOVATIVE FACADE REFURBISHMENT WITH INTEGRATED AIR DUCTING FOR THE EXISTING BUILDING STOCK [J].
Ziegler, Matthias ;
Krause, Michael .
SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, :207-210
[38]   COLLABORATION ON REFURBISHMENT OF TUNNEL BORING MACHINES (TBMS) FOR THE KVMRT PUTRAJAYA LINE [J].
Klados, G. ;
Ng, H. W. ;
Ng, K. P. ;
Khairi, M. .
AUSTRALIAN GEOMECHANICS JOURNAL, 2021, 56 (02) :127-140
[39]   A Conceptual Innovative Risk Management Model for Commercial Buildings Refurbishment Projects [J].
Masrom, Md Asrul Nasid ;
Chan, Melissa ;
Ahamad, Junaidi .
INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (03) :342-351
[40]   An Innovative Balanced-Yielding Support Method for Tunnel in Deep Inclined Strata [J].
Wei Yongke ;
Guo Hongyan ;
Hu Juyi ;
Liu Jiaqing ;
Liu Limin .
GEOFLUIDS, 2022, 2022