Innovative method of rail tunnel refurbishment

被引:0
作者
Wetzig, V. [1 ]
Baumann, K. [2 ]
Riedl, A. [1 ]
机构
[1] Hagerbach Test Gallery Ltd, CH-8893 Flums, Switzerland
[2] Rhaetian Railway, CH-7002 Chur, Switzerland
来源
UNDERGROUND - THE WAY TO THE FUTURE | 2013年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Private Railway organizations, like Rhaetian Railway (RhB), operate more than 50 km of tunnels aged more than 100 years. Refurbishment of those tunnels has to happen during the short period of night break. RhB developed a standardized system and tested this at Hagerbach Test Gallery to prove the concept and eliminate weaknesses before applying the system at their tunnel net. The main idea is to decentralize the working process by prefabrication of elements - a kind of segmental lining - which will be put in place during the night break. Also the machinery equipment to handle all the operations had have to be developed to realize an effective and mobile equipment which makes the maximum use of the night break. About 9 m tunnel lining can be refurbished per night with this procedure. For the evaluation process Hagerbach Test Gallery excavated a section of 40 m of tunnel with the shape of an old narrow railway tunnel. In this section the cycle of the refurbishment of tunnel composed of the steps removing the existing lining, temporary support, installation drainage, preparing for placing of elements, the placing of the elements itself and backfilling them was tested and trained with the contractor who will do the work.
引用
收藏
页码:505 / 511
页数:7
相关论文
共 50 条
[21]   Refurbishment of old railway tunnels using the Tauern Tunnel as an example [J].
Moritz, Bernd ;
Themessl, Florian ;
Höhndorf, Markus ;
Helmberger, Albert .
Geomechanik und Tunnelbau, 2024, 17 (05) :482-494
[22]   INNOVATIVE DESIGN TOOLS FOR SUSTAINABLE REFURBISHMENT OF LARGE BUILDING COMPLEXES [J].
Villa, Nadia ;
Bonacina, Carlo Filippo ;
Grecchi, Manuela ;
Iannaccone, Giuliana ;
Malighetti, Laura ;
Pizzi, Emilio ;
Ruta, Matteo .
SUSTAINABLE BUILDING AND REFURBISHMENT FOR NEXT GENERATIONS, 2013, :187-190
[23]   An innovative repair and refurbishment of an underground car park in Dresden, Germany [J].
Esteves, H. ;
Hammer, U. ;
Mayer, S. ;
Chess, P. .
CONCRETE SOLUTIONS, 2012, :25-29
[24]   An innovative method for parametric design of planing tunnel vessel Hull form [J].
Ghassabzadeh, Morteza ;
Ghassemi, Hassan .
OCEAN ENGINEERING, 2013, 60 :14-27
[25]   Channel Tunnel Rail Link section 2: Thames tunnel [J].
Burgess, Martin ;
Davies, Hadyn .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2007, 160 (06) :14-18
[26]   Tunnel refurbishment and evolving standards - the safety file solution in New Zealand [J].
Miezio, J. G. ;
Cooper, J. Q. .
UNDERGROUND - THE WAY TO THE FUTURE, 2013, :544-551
[27]   Corrugated rail tunnel lifted into place [J].
Hansen, Brett .
CIVIL ENGINEERING, 2007, 77 (10) :17-18
[28]   Dynamic aspects at the Botlek rail tunnel [J].
Stuit, HG .
(RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, :937-943
[29]   Clearance improvements for US rail tunnel [J].
Lee, Kuantsai ;
Goewey, C.T. .
Tunnels and Tunnelling, 1991, 23 (11)
[30]   Canopied portals for NATM rail tunnel [J].
Way, Anna .
Tunnels and Tunnelling International, 1993, 25 (09) :34-36