Innovative method of rail tunnel refurbishment

被引:0
|
作者
Wetzig, V. [1 ]
Baumann, K. [2 ]
Riedl, A. [1 ]
机构
[1] Hagerbach Test Gallery Ltd, CH-8893 Flums, Switzerland
[2] Rhaetian Railway, CH-7002 Chur, Switzerland
来源
UNDERGROUND - THE WAY TO THE FUTURE | 2013年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Private Railway organizations, like Rhaetian Railway (RhB), operate more than 50 km of tunnels aged more than 100 years. Refurbishment of those tunnels has to happen during the short period of night break. RhB developed a standardized system and tested this at Hagerbach Test Gallery to prove the concept and eliminate weaknesses before applying the system at their tunnel net. The main idea is to decentralize the working process by prefabrication of elements - a kind of segmental lining - which will be put in place during the night break. Also the machinery equipment to handle all the operations had have to be developed to realize an effective and mobile equipment which makes the maximum use of the night break. About 9 m tunnel lining can be refurbished per night with this procedure. For the evaluation process Hagerbach Test Gallery excavated a section of 40 m of tunnel with the shape of an old narrow railway tunnel. In this section the cycle of the refurbishment of tunnel composed of the steps removing the existing lining, temporary support, installation drainage, preparing for placing of elements, the placing of the elements itself and backfilling them was tested and trained with the contractor who will do the work.
引用
收藏
页码:505 / 511
页数:7
相关论文
共 50 条
  • [1] Rail tunnel refurbishment at Barncluith and Mossgiel, Scotland
    Morgan, Mike
    Concrete (London), 2002, 36 (04):
  • [2] The refurbishment strategy of the Seelisberg Tunnel
    Marty, R.
    Schaedler, B.
    Frey, D.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 520 - 527
  • [3] Investigation and analysis procedures for tunnel refurbishment
    Sandrone, F.
    Oggeri, C.
    Del Greco, O.
    ROCK MECHANICS IN CIVIL AND ENVIRONMENTAL ENGINEERING, 2010, : 521 - 524
  • [4] REFURBISHMENT AND UPGRADES TO THE RAIL VEHICLE CONTROL SYSTEM
    Felber, Antonin
    SOUCASNE PROBLEMY V KOLEJOVYCH VOZIDLECH, 2013, : 261 - 264
  • [5] Investigation and planning for the refurbishment of the original Tauern Tunnel
    Kohlböck B.
    Moser H.
    Geomechanik und Tunnelbau, 2010, 3 (04): : 379 - 390
  • [6] Refurbishment of the 2nd Namsan Tunnel
    Kim, SR
    SOIL MECHANICS AND GEOTECHNICAL ENGINEERING, VOL 2, 2001, : 801 - 802
  • [7] Refurbishment of the ventilation system of the Elbe tunnel in Hamburg
    Pospisil, Petr
    Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 894 - 897
  • [8] Refurbishment of the tailrace tunnel at La Fortuna, Panama
    Marois, S.
    International Journal on Hydropower and Dams, 2000, 7 (02): : 48 - 50
  • [9] Refurbishment of the Kuckuckslay tunnel – Current experience in the use of the ”Tunnel-im-Tunnel-Methode“
    Vetter S.
    Galli M.
    Steiner P.
    Steiner, Peter (peter.steiner@laabmayr.at), 1600, Ernst und Sohn (13): : 557 - 565
  • [10] Rail tunnel risk analysis - A tool to improve rail tunnel design
    Martinelli, Filippo
    Cara, Simone
    Domenichini, Lorenzo
    TRANSPORTATION RESEARCH RECORD, 2008, 2043 (2043) : 41 - 48