A fuzzy buffer setting method for project scheduling under uncertainty

被引:0
作者
Zhou, Yikun [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
来源
ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4 | 2013年 / 291-294卷
关键词
Project scheduling; Buffer setting; Fuzzy; TRADE-OFF; STABILITY; MAKESPAN;
D O I
10.4028/www.scientific.net/AMM.291-294.2889
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The buffer setting methods are useful ways to deal with the uncertainty. However, few has concern how to estimate the safe time of each project activity, which is used to set the buffer, when historic information of project is not enough. In this paper a fuzzy buffer setting method is proposed to solve the shortage. The fuzzy method has three steps: estimate the fuzzy duration, calculate the safe time and determine the buffer size. A calculation example is also given to introduce the detail procedure of this method.
引用
收藏
页码:2889 / 2894
页数:6
相关论文
共 50 条
[41]   Multimode time-cost-robustness trade-off project scheduling problem under uncertainty [J].
Li, Xue ;
He, Zhengwen ;
Wang, Nengmin ;
Vanhoucke, Mario .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (05) :1173-1202
[42]   Multimode time-cost-robustness trade-off project scheduling problem under uncertainty [J].
Xue Li ;
Zhengwen He ;
Nengmin Wang ;
Mario Vanhoucke .
Journal of Combinatorial Optimization, 2022, 43 :1173-1202
[43]   A fuzzy time-dependent project scheduling problem [J].
Huang, Wei ;
Oh, Sung-Kwun ;
Pedrycz, Witold .
INFORMATION SCIENCES, 2013, 246 :100-114
[44]   Fuzzy Activity Starting Time Estimation for Project Scheduling [J].
Liu, Yu-Chuan .
PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2010, 9 :550-556
[45]   Project Scheduling to Maximize Fuzzy Net Present Value [J].
Ucal, Irem ;
Kuchta, Dorota .
WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL II, 2011, :1184-1189
[46]   FUZZY PROJECT SCHEDULING SYSTEM FOR SOFTWARE-DEVELOPMENT [J].
HAPKE, M ;
JASZKIEWICZ, A ;
SLOWINSKI, R .
FUZZY SETS AND SYSTEMS, 1994, 67 (01) :101-117
[47]   Multi-Project Scheduling by Fuzzy Combinatorial Auction [J].
Cheng, Chi-Bin ;
Lo, Chiao-Yu .
2017 3RD IEEE INTERNATIONAL CONFERENCE ON CYBERNETICS (CYBCONF), 2017, :61-66
[48]   A Bilevel Model for Project Scheduling in a Fuzzy Random Environment [J].
Xu, Jiuping ;
Ma, Yanfang ;
Xu, Zeshui .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (10) :1322-1335
[49]   A Stable Scheduling for Single Machine under Uncertainty [J].
Li, Qiaoyun ;
Wang, Bing .
2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, :526-531
[50]   Scheduling under uncertainty: survey and research directions [J].
Chaari, Tarek ;
Chaabane, Sondes ;
Aissani, Nassima ;
Trentesaux, Damien .
2014 INTERNATIONAL CONFERENCE ON ADVANCED LOGISTICS & TRANSPORT (ICALT 2014), 2014, :229-234