A fuzzy buffer setting method for project scheduling under uncertainty

被引:0
作者
Zhou, Yikun [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
来源
ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4 | 2013年 / 291-294卷
关键词
Project scheduling; Buffer setting; Fuzzy; TRADE-OFF; STABILITY; MAKESPAN;
D O I
10.4028/www.scientific.net/AMM.291-294.2889
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The buffer setting methods are useful ways to deal with the uncertainty. However, few has concern how to estimate the safe time of each project activity, which is used to set the buffer, when historic information of project is not enough. In this paper a fuzzy buffer setting method is proposed to solve the shortage. The fuzzy method has three steps: estimate the fuzzy duration, calculate the safe time and determine the buffer size. A calculation example is also given to introduce the detail procedure of this method.
引用
收藏
页码:2889 / 2894
页数:6
相关论文
共 50 条
[31]   Fuzzy finish time modeling for project scheduling [J].
Yu-chuan Liu ;
Shih-ming Yang ;
Yu-te Lin .
Journal of Zhejiang University-SCIENCE A, 2010, 11 :946-952
[32]   Proactive-reactive repetitive project scheduling method - the concept of risk consideration at the project planning and execution stage [J].
Jaskowski, Piotr ;
Biruk, Slawomir ;
Krzeminski, Michal .
ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (04) :89-104
[33]   Underground mine scheduling under uncertainty [J].
Nesbitt, Peter ;
Blake, Lewis R. ;
Lamas, Patricio ;
Goycoolea, Marcos ;
Pagnoncelli, Bernardo K. ;
Newman, Alexandra ;
Brickey, Andrea .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 294 (01) :340-352
[34]   A fuzzy project buffer management algorithm: a case study in the construction of a renewable project [J].
Zohrehvandi, Shakib ;
Vanhoucke, Mario ;
Khalilzadeh, Mohammad ;
Amiri, Maghsoud ;
Shadrokh, Shahram .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (12) :2134-2143
[35]   Stability approach to CDC truck scheduling problem under uncertainty [J].
Fonseca, Gabriela B. ;
Nogueira, Thiago H. ;
Ravetti, Martin G. .
OPTIMIZATION LETTERS, 2025, 19 (04) :811-832
[36]   Proactive Project Scheduling With Activity Splitting and Resource Transfer Times Under Uncertain Environments [J].
Ma, Zhiqiang ;
Ning, Minjing ;
Wang, Yanting .
IEEE ACCESS, 2022, 10 :87490-87499
[37]   Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities [J].
Zheng, Wei-bo ;
He, Yu-kang .
PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, :239-243
[38]   Project scheduling problem with mixed uncertainty of randomness and fuzziness [J].
Ke, Hua ;
Liu, Baoding .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (01) :135-147
[39]   ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS [J].
Shih, Neng-Hui .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) :494-500
[40]   Integrated scheduling of suppliers and multi-project activities for green construction supply chains under uncertainty [J].
RezaHoseini, Ali ;
Noori, Siamak ;
Ghannadpour, Seyed Farid .
AUTOMATION IN CONSTRUCTION, 2021, 122