A fuzzy buffer setting method for project scheduling under uncertainty

被引:0
作者
Zhou, Yikun [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
来源
ADVANCES IN ENERGY SCIENCE AND TECHNOLOGY, PTS 1-4 | 2013年 / 291-294卷
关键词
Project scheduling; Buffer setting; Fuzzy; TRADE-OFF; STABILITY; MAKESPAN;
D O I
10.4028/www.scientific.net/AMM.291-294.2889
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The buffer setting methods are useful ways to deal with the uncertainty. However, few has concern how to estimate the safe time of each project activity, which is used to set the buffer, when historic information of project is not enough. In this paper a fuzzy buffer setting method is proposed to solve the shortage. The fuzzy method has three steps: estimate the fuzzy duration, calculate the safe time and determine the buffer size. A calculation example is also given to introduce the detail procedure of this method.
引用
收藏
页码:2889 / 2894
页数:6
相关论文
共 50 条
[21]   Resource-constrained project scheduling approach under fuzzy conditions [J].
Knyazeva, Margarita ;
Bozhenyuk, Alexander ;
Rozenberg, Igor .
ICTE IN REGIONAL DEVELOPMENT 2015, 2015, 77 :56-64
[22]   Inventory-scheduling problem in sustainable project supply chain under uncertainty [J].
Aliahmadi M. ;
Yaghoubi S. ;
Sadeghi M. .
Environment Systems and Decisions, 2024, 44 (4) :836-852
[23]   Time slack-based techniques for robust project scheduling subject to resource uncertainty [J].
Lambrechts, Olivier ;
Demeulemeester, Erik ;
Herroelen, Willy .
ANNALS OF OPERATIONS RESEARCH, 2011, 186 (01) :443-464
[24]   A new comprehensive project scheduling, monitoring, and management framework based on the critical chain under interval type-2 fuzzy uncertainty [J].
Aramesh, S. ;
Mousavi, S. M. ;
Mohagheghi, V. .
IRANIAN JOURNAL OF FUZZY SYSTEMS, 2021, 18 (01) :151-170
[25]   Buffer methods comparison in robust project scheduling with project network characteristics [J].
Cui, Nan-Fang ;
Zhao, Yan .
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (01) :280-288
[26]   Fuzzy priority heuristics for project scheduling [J].
Hapke, M ;
Slowinski, R .
FUZZY SETS AND SYSTEMS, 1996, 83 (03) :291-299
[27]   Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules [J].
Servranckx, Tom ;
Vanhoucke, Mario .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 279 (01) :38-53
[28]   An Uncertainty Tolerant Approach For Stochastic Resource Constrained Project Scheduling Problems [J].
Chakrabortty, Ripon K. ;
Ryan, Michael J. .
2019 IEEE TECHNOLOGY & ENGINEERING MANAGEMENT CONFERENCE (TEMSCON), 2019,
[29]   Modeling and solution algorithm for project scheduling problem considering man-hour under uncertainty [J].
Kitamura T. ;
Shiina T. .
Journal of Japan Industrial Management Association, 2021, 72 (01) :37-45
[30]   Fuzzy finish time modeling for project scheduling [J].
Shih-ming YANG .
Journal of Zhejiang University-Science A(Applied Physics & Engineering), 2010, 11 (12) :946-952