Deepwater methods to address system of system risks

被引:0
|
作者
Barrett, TJ [1 ]
机构
[1] Potomac Inst Policy Studies, Arlington, VA USA
来源
INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOL 1-4, PROCEEDINGS | 2005年
关键词
deepwater; Coast Guard; system of systems; performance; metrics; acquisition; requirements; costs; total life cycle systems management;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
To replace aging and technologically obsolete aircraft, cutters and command and control infrastructure, the Coast Guard conceived and has begun a transformational recapitalization known as Deepwater. Deepwater is an integrated, performance-based, systems of systems acquisition. Costing $17 billion over 20 years, it is the single largest and most complex acquisition in Coast Guard history. It is also the first major federal acquisition program for a broad mission suite using an integrated, systems of systems design. This strategy involves unique technical, operational and political risk factors that Deepwater and other large networked system of systems acquisitions must manage well if they are to be successful, These include devising suitable performance metrics, managing system of systems boundaries, systematically controlling requirements changes, controlling total life cycle costs, gaining stable funding, and clearly communicating program concepts, including evolutionary cost and performance adjustments and baseline tradeoffs.
引用
收藏
页码:92 / 96
页数:5
相关论文
共 50 条
  • [21] MOBIL DESIGNS SYSTEM FOR DEEPWATER PRODUCTION.
    Anon
    1600, (81):
  • [22] Deepwater mooring system using CT technology
    Head, Phil
    Turner, Dan
    French, David
    Atkins, W.S.
    Hanson, Tim
    Cameron, Gerry
    Hess, Amerada
    Proceedings of the SPE/ICoTA Coiled Tubing Roundtable Conf, 1999, : 269 - 277
  • [23] Innovative deepwater drillpipe-riser system
    不详
    JOURNAL OF PETROLEUM TECHNOLOGY, 1999, 51 (08): : 50 - 51
  • [24] A hybrid approach for turret deepwater mooring system
    Shin, H
    Kim, T
    Lee, H
    Kim, J
    DEEPWATER MOORING SYSTEMS: CONCEPTS, DESIGN, ANALYSIS AND MATERIALS, 2003, : 227 - 238
  • [25] An Optimal Method for Deepwater Oilfield Development System
    Qiu, Weiwei
    Xu, Xiaoxuan
    5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING, 2019, 358
  • [27] A combined riser mooring system for deepwater applications
    Hogg, B
    Harte, AM
    Grealish, F
    JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2004, 126 (04): : 273 - 279
  • [28] Numerical simulation of the deepwater current generation system
    Lu, Haining
    Yang, Jianmin
    Peng, Tao
    PROCEEDINGS OF THE SIXTEENTH (2006) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 2006, : 278 - +
  • [29] Economics of a deepwater early production & test system
    Grecco, Michael G.
    Tein, David
    Ocean Industry, 1992, 27 (07):
  • [30] Deepwater ROV system for T6
    Anon
    Journal of Offshore Technology, 1998, 6 (01): : 19 - 20