共 50 条
[41]
Predicting the Optimal Period for Cyclic Hoist Scheduling Problems
[J].
INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, CPAIOR 2023,
2023, 13884
:238-253
[42]
QUANTITATIVE MODELS FOR OPTIMAL REST PERIOD SCHEDULING - NOTE
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1979, 7 (06)
:565-566
[44]
SCHEDULING A CHEMICAL-PROCESSING TANK LINE
[J].
IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY,
1993, 13
:457-468
[50]
Characterizing the optimal allocation of storage space in production line systems with variable processing times
[J].
IIE Transactions (Institute of Industrial Engineers),
2000, 32 (01)
:1-8