Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming

被引:69
|
作者
Moghaddam, Kamran S. [1 ]
机构
[1] Southern Polytech State Univ, Marietta, GA 30060 USA
关键词
Preventive maintenance scheduling; Manufacturing planning; Multi-objective optimization; Goal programming; Monte Carlo simulation; Simulation optimization; HYBRID FLOW-SHOP; GENETIC ALGORITHMS; SINGLE-MACHINE; OPTIMIZATION; SIMULATION;
D O I
10.1016/j.ijpe.2013.08.027
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research presents a new multi-objective nonlinear mixed-integer optimization model to determine Pareto-optimal preventive maintenance and replacement schedules for a repairable multi-workstation manufacturing system with increasing rate of occurrence of failure. The operational planning horizon is segmented into discrete and equally-sized periods and in each period three possible maintenance actions (repair, replacement, or do nothing) have been considered for each workstation. The optimal maintenance decisions for each workstation in each period are investigated such that the objectives and the requirements of the system can be achieved. Total operational costs, overall reliability and the system availability are incorporated as the objective functions and the multi-objective model is solved using a hybrid Monte Carlo simulation and goal programming procedure to obtain set of non-dominated schedules. The effectiveness and feasibility of the proposed solution methodology are demonstrated in a manufacturing setting and the computational performance of method in obtaining Pareto-optimal solutions is evaluated. Such a modeling approach and the proposed solution algorithm could be useful for maintenance planners and engineers tasked with the problem of developing optimal maintenance plans for complex productions systems. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:704 / 716
页数:13
相关论文
共 50 条
  • [1] A new multi-objective optimization model for preventive maintenance and replacement scheduling of multi-component systems
    Moghaddam, Kamran S.
    Usher, John S.
    ENGINEERING OPTIMIZATION, 2011, 43 (07) : 701 - 719
  • [2] Multi-objective group scheduling optimization integrated with preventive maintenance
    Liao, Wenzhu
    Zhang, Xiufang
    Jiang, Min
    ENGINEERING OPTIMIZATION, 2017, 49 (11) : 1890 - 1904
  • [3] MULTI-OBJECTIVE INITIAL PREVENTIVE MAINTENANCE SCHEDULING FOR LARGE ENGINEERING PLANTS
    Verma, A. K.
    Ramesh, P. G.
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2007, 14 (03): : 241 - 250
  • [4] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    V. Ebrahimipour
    A. Najjarbashi
    M. Sheikhalishahi
    Journal of Intelligent Manufacturing, 2015, 26 : 111 - 122
  • [5] Multi-objective modeling for preventive maintenance scheduling in a multiple production line
    Ebrahimipour, V.
    Najjarbashi, A.
    Sheikhalishahi, M.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (01) : 111 - 122
  • [6] Production scheduling and preventive maintenance integration based on multi-objective optimization
    Cui, Wei-Wei
    Lu, Zhi-Qiang
    Pan, Er-Shun
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2014, 20 (06): : 1398 - 1404
  • [7] A Multi-Objective Modeling Approach for Integrated Manufacturing and Preventive Maintenance Planning
    Moghaddam, Kamran S.
    OPERATIONS AND SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2021, 14 (01): : 83 - 99
  • [8] An efficient force planning system using multi-objective linear goal programming
    Kim, SH
    Ahn, BS
    Choi, SH
    COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (06) : 569 - 580
  • [9] Multi-Objective Intelligent Manufacturing System for Multi Machine Scheduling
    Bansal, Sunita
    Darbari, Manuj
    INTERNATIONAL JOURNAL OF ADVANCED COMPUTER SCIENCE AND APPLICATIONS, 2012, 3 (03) : 102 - 105
  • [10] Multi-objective Task Scheduling in cloud-fog computing using goal programming approach
    Abbas Najafizadeh
    Afshin Salajegheh
    Amir Masoud Rahmani
    Amir Sahafi
    Cluster Computing, 2022, 25 : 141 - 165