A two-machine multi-family flowshop scheduling problem with batch processing

被引:0
作者
Yang, DL [1 ]
Chern, MS
Wang, JT
机构
[1] Nan Kai Coll, Dept Ind Engn & Management, Nantou, Taiwan
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 300, Taiwan
[3] Van Nung Inst Technol, Dept Ind Management, Chungli 320, Taiwan
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2001年 / 8卷 / 04期
关键词
flowshop; batch processing machine; makespan;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a two-machine multi-family flowshop scheduling problem with non-identical capacity requirements or sizes on a batch processing machine. A batch processing machine is the one which can process a number of jobs simultaneously as a batch. Once the process begins, no job can be released from the batch machine until the entire batch is completely processed. The objective is to find a sequence of families and sequence of jobs in each family such that the makespan is minimized. We show that the optimal sequence of batches can be determined by a full batch grouping policy.. A polynomial time algorithm is proposed for solving this problem. An Illustrated example is also provided.
引用
收藏
页码:289 / 298
页数:10
相关论文
共 15 条
[11]   SEQUENCY ON 2 AND 3 MACHINES WITH SETUP, PROCESSING AND REMOVAL TIMES SEPARATED [J].
SULE, DR ;
HUANG, KY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1983, 21 (05) :723-732
[14]  
YANG DL, 1997, P CIIE C KAOSIUNG TA, P36
[15]   OPTIMAL 2-STAGE PRODUCTION SCHEDULING WITH SETUP TIMES SEPARATED [J].
YOSHIDA, T ;
HITOMI, K .
AIIE TRANSACTIONS, 1979, 11 (03) :261-263