A two-machine multi-family flowshop scheduling problem with batch processing

被引:0
作者
Yang, DL [1 ]
Chern, MS
Wang, JT
机构
[1] Nan Kai Coll, Dept Ind Engn & Management, Nantou, Taiwan
[2] Natl Tsing Hua Univ, Dept Ind Engn & Engn Management, Hsinchu 300, Taiwan
[3] Van Nung Inst Technol, Dept Ind Management, Chungli 320, Taiwan
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2001年 / 8卷 / 04期
关键词
flowshop; batch processing machine; makespan;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a two-machine multi-family flowshop scheduling problem with non-identical capacity requirements or sizes on a batch processing machine. A batch processing machine is the one which can process a number of jobs simultaneously as a batch. Once the process begins, no job can be released from the batch machine until the entire batch is completely processed. The objective is to find a sequence of families and sequence of jobs in each family such that the makespan is minimized. We show that the optimal sequence of batches can be determined by a full batch grouping policy.. A polynomial time algorithm is proposed for solving this problem. An Illustrated example is also provided.
引用
收藏
页码:289 / 298
页数:10
相关论文
共 15 条
[1]  
AHMADI JH, 1992, OPER RES, V39, P750
[2]   SCHEDULING GROUPS OF JOBS IN THE 2-MACHINE FLOW-SHOP [J].
BAKER, KR .
MATHEMATICAL AND COMPUTER MODELLING, 1990, 13 (03) :29-36
[3]   MINIMIZING TOTAL COMPLETION-TIME ON BATCH PROCESSING MACHINES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (09) :2097-2121
[4]  
FRENCH S, 1980, SEQUENCE SCHEDULING
[5]   EFFICIENT SCHEDULING ALGORITHMS FOR A SINGLE BATCH PROCESSING MACHINE [J].
IKURA, Y ;
GIMPLE, M .
OPERATIONS RESEARCH LETTERS, 1986, 5 (02) :61-65
[6]  
*ITRI, 1997, YB SEM IND 1997
[7]  
Johnson Selmer Martin., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110, 10.1002/(ISSN)1931-9193]
[8]  
KAN HGR, 1976, MACHINE SCHEDULING P
[9]   EFFICIENT ALGORITHMS FOR SCHEDULING SEMICONDUCTOR BURN-IN OPERATIONS [J].
LEE, CY ;
UZSOY, R ;
MARTINVEGA, LA .
OPERATIONS RESEARCH, 1992, 40 (04) :764-775