共 30 条
[1]
RISK-EVALUATION IN RESOURCE-ALLOCATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1984, 110 (03)
:324-336
[2]
ANG AHS, 1975, J ENG MECH DIV-ASCE, V101, P373
[3]
[Anonymous], J CHINESE I ENG T A
[4]
PROJECT SCHEDULING USING FUZZY SET CONCEPTS
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1984, 110 (02)
:189-204
[7]
CHUA KH, 1995, P 1 INT C CONSTR PRO, P383
[8]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (08)
:944-955
[9]
Davis EW, 1973, AIIE Transactions, V5, P297
[10]
NONDETERMINISTIC NETWORKING METHODS
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1993, 119 (01)
:40-57