Fuzzy optimal model for resource-constrained construction scheduling

被引:28
作者
Leu, SS [1 ]
Chen, AT [1 ]
Yang, CH [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Constr Engn, Taipei 10672, Taiwan
关键词
D O I
10.1061/(ASCE)0887-3801(1999)13:3(207)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Activity duration is uncertain due to the variation in the outside environment, such as weather, site congestion, productivity level, etc. Furthermore, resources for construction activities are limited in the real construction world so that scheduling must include resource allocation. A new optimal resource-constrained construction scheduling model is proposed in this paper, in which the effects of both uncertain activity duration and resource constraints are taken into account. Fuzzy set theory is used to model the uncertainties of activity duration. A genetic algorithm-based searching technique is adopted to search for the fuzzy optimal project duration under resource constraints. The model can effectively provide the optimal fuzzy profiles of project duration and resource amounts under the constraint of limited resources.
引用
收藏
页码:207 / 216
页数:10
相关论文
共 30 条
[1]   RISK-EVALUATION IN RESOURCE-ALLOCATION [J].
AHUJA, HN ;
ARUNACHALAM, V .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (03) :324-336
[2]  
ANG AHS, 1975, J ENG MECH DIV-ASCE, V101, P373
[3]  
[Anonymous], J CHINESE I ENG T A
[4]   PROJECT SCHEDULING USING FUZZY SET CONCEPTS [J].
AYYUB, BM ;
HALDAR, A .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1984, 110 (02) :189-204
[5]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[6]   THE USE OF FUZZY VARIABLES IN PERT [J].
CHANAS, S ;
KAMBUROWSKI, J .
FUZZY SETS AND SYSTEMS, 1981, 5 (01) :11-19
[7]  
CHUA KH, 1995, P 1 INT C CONSTR PRO, P383
[8]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[9]  
Davis EW, 1973, AIIE Transactions, V5, P297
[10]   NONDETERMINISTIC NETWORKING METHODS [J].
DIAZ, CF ;
HADIPRIONO, FC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (01) :40-57