THE USE OF MATHEMATICAL PROGRAMMING TO DETERMINE OPTIMAL PRODUCTION AND DRILLING SCHEDULE IN AN OFFSHORE OIL FIELD, A CASE STUDY FROM THE BARENTS SEA

被引:0
作者
Lei, Guowen [1 ]
Stanko, Milan [1 ]
Silva, Thiago Lima [1 ]
Wideroe, Tom [2 ]
Skogvang, Arnljot [2 ]
机构
[1] Norwegian Univ Sci & Technol, Dept Geoscience & Petr, NO-7031 Trondheim, Norway
[2] Lundin Energy Norway, NO-1366 Lysaker, Norway
来源
PROCEEDINGS OF ASME 2021 40TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING (OMAE2021), VOL 10 | 2021年
关键词
Oil field development; Mathematical programming; Production and drilling scheduling optimization; Barents Sea; Case study; OPTIMIZATION MODEL; PETROLEUM; UNCERTAINTY; LOCATION; INFRASTRUCTURE; INVESTMENT; MANAGEMENT; PLATFORMS; SYSTEMS;
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A field with two neighboring reservoirs was discovered in the Barents Sea in 2013 and 2014. After a successful extended well test of an appraisal well in 2018 and initial field planning tasks, a preliminary drilling and production schedule was proposed based on cross-domain collaboration and group work involving several disciplines. In this paper, mathematical programming is employed to model and optimize the economic value of the project in order to determine the best drilling and production schedule for the field. The optimization includes some of the technical constraints considered by the field development team while also considering uncertainties such as reservoir size, productivity of well, and cost. These have been systematically evaluated by using simulation-based optimization (sampling). The results were that the use of mathematical programming allows the field planner to evaluate several scenarios within a reasonable time frame, thereby enabling rapid changes in the decisions to respond to new information and risk considerations in a dynamic environment. This paper illustrates the benefits of utilizing mathematical programming in early field planning to optimize the drilling and production schedule.
引用
收藏
页数:12
相关论文
共 48 条
[1]   Multilevel Field Development Optimization Under Uncertainty Using a Sequence of Upscaled Models [J].
Aliyev, Elnur ;
Durlofsky, Louis J. .
MATHEMATICAL GEOSCIENCES, 2017, 49 (03) :307-339
[2]  
Alkindira S., 2020, NUMERICAL OPTIMIZATI
[3]  
Angga I. G. A, 2019, THESIS NORWEGIAN U S
[4]  
[Anonymous], 2020, RESOURCES SEA AREA
[5]   THE USE OF LINEAR-PROGRAMMING AND MATHEMATICAL-MODELS IN UNDERGROUND OIL PRODUCTION [J].
ARONOFSKY, JS ;
WILLIAMS, AC .
MANAGEMENT SCIENCE, 1962, 8 (04) :394-407
[6]  
Avansi GD., 2015, INT J MODEL SIMUL PE, V9, P21
[7]   Multiperiod optimization model for oilfield production planning: bicriterion optimization and two-stage stochastic programming model [J].
Awasthi, Utsav ;
Marmier, Remy ;
Grossmann, Ignacio E. .
OPTIMIZATION AND ENGINEERING, 2019, 20 (04) :1227-1248
[8]   A mean-variance objective for robust production optimization in uncertain geological scenarios [J].
Capolei, Andrea ;
Suwartadi, Eka ;
Foss, Bjarne ;
Jorgensen, John Bagterp .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2015, 125 :23-37
[9]   Output-Constraint Handling and Parallelization for Oil-Reservoir Control Optimization by Means of Multiple Shooting [J].
Codas, Andres ;
Foss, Bjarne ;
Camponogara, Eduardo .
SPE JOURNAL, 2015, 20 (04) :856-871
[10]  
DEVINE MD, 1972, MANAGE SCI B-APPL, V18, pB378, DOI 10.1287/mnsc.18.8.B378