共 40 条
- [3] Alkass S., 1996, CONSTR MANAG ECON, V14, P375, DOI DOI 10.1080/014461996373250
- [4] [Anonymous], 2001, MORGANTI NATL INC US
- [5] Selecting a delay analysis method in resolving construction claims [J]. Int. J. Proj. Manage., 2006, 2 (145-155): : 145 - 155
- [6] Analysis methods in time-based claims [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (04): : 242 - 252
- [7] Armed Services Board of Contract Appeals (ASBCA), 2003, CONT ADV SYST INC NO
- [9] Association for the Advancement of Cost Engineering International AACEI, 2011, AACE INT REC PRACT 2, P9
- [10] Avalon A, 2017, CHOOSING MOST APPROP