Multi-station Job Shop Scheduling with Operations Overlapping

被引:0
作者
Chai, Yongsheng [1 ]
Zhou, Yulan [1 ]
Wang, Yantao [1 ]
机构
[1] Yantai Univ, Sch Electromech Engn, Yantai 264005, Peoples R China
来源
2008 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-5 | 2008年
关键词
job shop; scheduling; multi-station; SPT; FCS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A new problem of job shop scheduling with multi-station processing arisen from the small and precision industry was addressed, which can fix more than one jobs at a workcenter once. The jobs that synchronously set up at the multi-station were denoted as a group and the same jobs were classed as a batch. A batch processing time was divided to several group processing time. The problem's objective was to minimize the total completion time C(max). A hierarchy strategy was introduced: the shortest processing time first rule (SPT) was applied to sequence the operations of all jobs and a foreword constraint satisfaction algorithm (FCS) was used to restore the operation of the group jobs and came out an overlapping group operation schedule. Later, the developed algorithm was tested on real-world data obtained from a hard disk company.
引用
收藏
页码:1753 / 1756
页数:4
相关论文
共 6 条
[1]  
[Anonymous], 2001, SCHEDULING THEORY AL
[2]  
CHAI YS, 2006, 6 WORLD C INT CONTR, V9, P7338
[3]   Batch splitting in an assembly scheduling environment [J].
Dastidar, Satyaki Ghosh ;
Nagi, Rakesh .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (02) :372-384
[4]   DYNAMIC JOB SHOP SCHEDULING - A SURVEY OF SIMULATION RESEARCH [J].
RAMASESH, R .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1990, 18 (01) :43-57
[5]   DYNAMIC SCHEDULING - A SURVEY OF RESEARCH [J].
SURESH, V ;
CHAUDHURI, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) :53-63
[6]  
Zhao Yu-Fang, 2006, Acta Automatica Sinica, V32, P730