A model for rest allowance estimation to improve tasks assignment to operators

被引:44
作者
Calzavara, Martina [1 ]
Persona, Alessandro [1 ]
Sgarbossa, Fabio [1 ]
Visentin, Valentina [1 ]
机构
[1] Univ Padua, Dept Management & Engn, Padua, Italy
关键词
manual activities; fatigue; recovery; energy expenditure rate; rest allowance; ENERGY-EXPENDITURE; HEART-RATE; MUSCLE RECOVERY; ORDER PICKING; FATIGUE; TIME; ERGONOMICS; PREDICTION; WORK/REST; DESIGN;
D O I
10.1080/00207543.2018.1497816
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manual activities are still present in production systems, such as order picking in warehouses, material handling in production systems, loading and unloading of work centres. Many scientific contributions have widely demonstrated production system efficiency is strictly linked to the operator wellbeing. In fact, activities at different pace and duration imply different productivity but also different effects on the fatigue accumulation acquired by the operators, with consequently required resting period. It is necessary to integrate operator fatigue and recovery analysis into traditional decision support models for the design and management of production systems. This paper aims to present an analytical model for setting the time necessary for operators to recover from the performed activity. According to previous research, the exponential trend of fatigue accumulation and recovery alleviation is studied. The energy expenditure rate, predicted with heart rate monitoring, is used to model the fatigue/recovery level, varying the physiological factors of the operators and the characteristics of the analysed manual activities. The model is limited to the activities where the whole body is used rather than a specific part stressed continuously. Finally, it is applied to optimise the scheduling of activities among operators in a manual order picking system. It is demonstrated that its use improves performance in terms of productivity.
引用
收藏
页码:948 / 962
页数:15
相关论文
共 51 条
[11]   A CRITICAL-EVALUATION OF ENERGY-EXPENDITURE ESTIMATES BASED ON INDIVIDUAL O-2 CONSUMPTION HEART-RATE CURVES AND AVERAGE DAILY HEART-RATE [J].
CHRISTENSEN, CC ;
FREY, HMM ;
FOENSTELIEN, E ;
AADLAND, E ;
REFSUM, HE .
AMERICAN JOURNAL OF CLINICAL NUTRITION, 1983, 37 (03) :468-472
[12]   Integrating human factors into discrete event simulation: a proactive approach to simultaneously design for system performance and employees' well being [J].
Dode, Petrit ;
Greig, Michael ;
Zolfaghari, Saeed ;
Neumann, W. Patrick .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (10) :3105-3117
[13]   Percentile values for determining maximum endurance times for static muscular work [J].
El Ahrache, K ;
Imbeau, D ;
Farbos, B .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2006, 36 (02) :99-108
[14]   Comparison of rest allowance models for static muscular work [J].
El ahrache, Khalid ;
Imbeau, Daniel L. .
INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2009, 39 (01) :73-80
[15]   PREDICTION OF METABOLIC RATES FOR MANUAL MATERIALS HANDLING JOBS [J].
GARG, A ;
CHAFFIN, DB ;
HERRIN, GD .
AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, 1978, 39 (08) :661-674
[16]  
Gawron VJ, 2001, HUM FAC TRANSP, P581
[17]   Modelling worker reliability with learning and fatigue [J].
Givi, Z. S. ;
Jaber, M. Y. ;
Neumann, W. P. .
APPLIED MATHEMATICAL MODELLING, 2015, 39 (17) :5186-5199
[18]  
GRANDJEAN E, 1979, BRIT J IND MED, V36, P175
[19]  
Groover M. P., 2007, WORK SYSTEMS METHODS, P27
[20]   Human factors in order picking: a content analysis of the literature [J].
Grosse, Eric H. ;
Glock, Christoph H. ;
Neumann, W. Patrick .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (05) :1260-1276