A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines

被引:13
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
Scheduling; Flowshop; Makespan; Dynamic programming; Heuristic; Not-All-Machines; ALGORITHM; NUMBER; JOBS;
D O I
10.1016/j.ijpe.2013.06.018
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and are processed in batches, where a machine-dependent setup time is required when starting a new batch. The objective function is minimum makespan. We introduce an exact efficient dynamic programming algorithm, which is shown numerically to be able to solve medium size instances in very reasonable time. For the solution of large instances, we propose an asymptotically optimal heuristic procedure and a lower bound on the makespan value, which produce extremely small optimality gaps. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:161 / 166
页数:6
相关论文
共 50 条
[41]   A two-stage assembly flow-shop scheduling problem with bi-level products structure and machines' availability constraints [J].
Nikouei, Mohammad Ali ;
Zandieh, Mostafa ;
Amiri, Maghsoud .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2022, 39 (06) :494-503
[42]   Multi-objective two-stage multiprocessor flow shop scheduling - a subgroup particle swarm optimisation approach [J].
Huang, Rong-Hwa ;
Yang, Chang-Lin ;
Hsu, Chun-Ting .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2015, 46 (16) :3010-3018
[43]   Scheduling in a two-stage flowshop with parallel unrelated machines at each stage and shared resources [J].
Figielska, Ewa .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 :435-450
[44]   Improved black widow optimization algorithm for multi-objective hybrid flow shop batch-scheduling problem [J].
Liu, Xiyang ;
Luan, Fangjun .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2025, 49 (03)
[45]   Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production [J].
Huang, Rong-Hwa ;
Yu, Shun-Chi .
JOURNAL OF CLEANER PRODUCTION, 2016, 135 :276-283
[46]   Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines [J].
Zahedi, Zahedi ;
Salim, Ashadi ;
Yusriski, Rinto ;
Haris, Haris .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (02) :225-238
[47]   No-wait two-stage multiprocessor flow shop scheduling with unit setup [J].
Huang, Rong-Hwa ;
Yang, Chang-Lin ;
Huang, Yau-Chi .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (9-10) :921-927
[48]   Two-machine flow shop scheduling problem with an outsourcing option [J].
Choi, Byung-Cheon ;
Chung, Jibok .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) :66-72
[49]   Minimising tardiness in hybrid two-stage batch scheduling problem in cyber-physical systems [J].
Liu, Changchun ;
Wang, Qiang ;
Xiang, Xi ;
Zheng, Li .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (02) :276-306
[50]   An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan [J].
Liao, Ching-Jong ;
Lee, Cheng-Hsiung ;
Lee, Hong-Chieh .
COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 88 :317-325