共 50 条
- [23] Minimizing Makespan in a Flow Shop with Two Batch Machines PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 283 - 292
- [24] Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 1487 - 1491
- [27] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
- [29] The optimal number of used machines in a two-stage flexible flowshop scheduling problem Journal of Scheduling, 2014, 17 : 199 - 210