A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines

被引:13
作者
Gerstl, Enrique [1 ]
Mosheiov, Gur [1 ]
机构
[1] Hebrew Univ Jerusalem, Sch Business Adm, IL-91905 Jerusalem, Israel
关键词
Scheduling; Flowshop; Makespan; Dynamic programming; Heuristic; Not-All-Machines; ALGORITHM; NUMBER; JOBS;
D O I
10.1016/j.ijpe.2013.06.018
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The decision whether to use all the available machines in the shop becomes very relevant when the capacity exceeds the demand. In such cases, it might be optimal to use only a subset of the machines. We study this option in a two-stage flowshop environment. Jobs are assumed to be identical, and are processed in batches, where a machine-dependent setup time is required when starting a new batch. The objective function is minimum makespan. We introduce an exact efficient dynamic programming algorithm, which is shown numerically to be able to solve medium size instances in very reasonable time. For the solution of large instances, we propose an asymptotically optimal heuristic procedure and a lower bound on the makespan value, which produce extremely small optimality gaps. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:161 / 166
页数:6
相关论文
共 50 条
  • [21] Outsourcing and production scheduling for a two-stage flow shop
    Qi, Xiangtong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 129 (01) : 43 - 50
  • [22] The two-stage no-wait/blocking proportionate super shop scheduling problem
    Koulamas, Christos
    Panwalkar, S. S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 2956 - 2965
  • [23] Minimizing Makespan in a Flow Shop with Two Batch Machines
    Huang, Jin-dian
    Liu, Jian-jun
    Chen, Qing-xin
    Mao, Ning
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 283 - 292
  • [24] Evaluation Dispatching Rules for Two-Stage Hybrid Flow Shop Scheduling with Parallel Machines
    Kaweegitbundit, Parinya
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 1487 - 1491
  • [25] Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems
    Komaki, G. M.
    Teymourian, Ehsan
    Kayvanfar, Vahid
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 963 - 983
  • [26] ON THE TWO-STAGE HYBRID FLOW SHOP WITH DEDICATED MACHINES
    Hadda, Hatem
    Hajji, Mohamed Karim
    Dridi, Najoua
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 795 - 804
  • [27] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan
    Ren, Tao
    Liu, Bingqian
    Zhao, Peng
    Yuan, Huawei
    Li, Haiyan
    Bai, Danyu
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
  • [28] TWO-STAGE FLOWSHOP SCHEDULING PROBLEMS WITH IDENTICAL AND BATCH PROCESSORS
    Wang Wen-Wei
    He Long-Min
    Cheng Ming-Bao
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (05) : 617 - 627
  • [29] The optimal number of used machines in a two-stage flexible flowshop scheduling problem
    Enrique Gerstl
    Gur Mosheiov
    Journal of Scheduling, 2014, 17 : 199 - 210
  • [30] A heuristic method for two-stage hybrid flow shop with dedicated machines
    Wang, Shijin
    Liu, Ming
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 438 - 450