The Value of Flexibility in Robust Location-Transportation Problems

被引:34
作者
Ardestani-Jaafari, Amir [1 ,2 ]
Delage, Erick [1 ,2 ]
机构
[1] HEC Montreal, Dept Decis Sci, Montreal, PQ H3T 2A7, Canada
[2] GERAD, Montreal, PQ H3T 1J4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
transportation; facility location; robust optimization; flexibility; conservative approximation; demand uncertainty; FACILITY LOCATION; OPTIMIZATION; DESIGN; MODELS;
D O I
10.1287/trsc.2016.0728
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This article studies a capacitated fixed-charge multiperiod location-transportation problem in which, while the location and capacity of each facility must be determined immediately, the determination of the final production and distribution of products can be delayed until actual orders are received in each period. In contexts where little is known about future demand, robust optimization, namely using a budgeted uncertainty set, becomes a natural method for identifying meaningful decisions. Unfortunately, it is well known that these types of multiperiod robust decision problems are computationally intractable. To overcome this difficulty, we propose a set of tractable conservative approximations for the problem that each exploit to a different extent the idea of reducing the flexibility of the delayed decisions. While all of these approximation models outperform previous approximation models that have been proposed for this problem, each also has the potential to reach a different level of compromise between efficiency of resolution and quality of the solution. A row generation algorithm is also presented to address problem instances of realistic size. We also demonstrate that full flexibility is often unnecessary to reach nearly, or even exact, optimal robust locations and capacities for the facilities. Finally, we illustrate our findings with an extensive numerical study wherewe evaluate the effect of the amount of uncertainty on the performance and structure of each approximate solution that can be obtained.
引用
收藏
页码:189 / 209
页数:21
相关论文
共 20 条
[1]   Designing Production-Inventory-Transportation Systems with Capacitated Cross-Docks [J].
Abouee-Mehrizi, Hossein ;
Berman, Oded ;
Baharnemati, M. Reza .
TRANSPORTATION SCIENCE, 2014, 48 (01) :121-135
[2]   Reliable p-median facility location problem: two-stage robust models and algorithms [J].
An, Yu ;
Zeng, Bo ;
Zhang, Yu ;
Zhao, Long .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2014, 64 :54-72
[3]   Two-stage robust network row and design under demand uncertahty [J].
Atamtuerk, Alper ;
Zhang, Muhong .
OPERATIONS RESEARCH, 2007, 55 (04) :662-673
[4]   Facility Location: A Robust Optimization Approach [J].
Baron, Opher ;
Milner, Joseph ;
Naseraldin, Hussein .
PRODUCTION AND OPERATIONS MANAGEMENT, 2011, 20 (05) :772-785
[5]   Adjustable robust solutions of uncertain linear programs [J].
Ben-Tal, A ;
Goryashko, A ;
Guslitzer, E ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2004, 99 (02) :351-376
[6]   The price of robustness [J].
Bertsimas, D ;
Sim, M .
OPERATIONS RESEARCH, 2004, 52 (01) :35-53
[7]   Duality in Two-Stage Adaptive Linear Optimization: Faster Computation and Stronger Bounds [J].
Bertsimas, Dimitris ;
de Ruiter, Frans J. C. T. .
INFORMS JOURNAL ON COMPUTING, 2016, 28 (03) :500-511
[8]   Theory and Applications of Robust Optimization [J].
Bertsimas, Dimitris ;
Brown, David B. ;
Caramanis, Constantine .
SIAM REVIEW, 2011, 53 (03) :464-501
[9]   On the power and limitations of affine policies in two-stage adaptive optimization [J].
Bertsimas, Dimitris ;
Goyal, Vineet .
MATHEMATICAL PROGRAMMING, 2012, 134 (02) :491-531
[10]   Uncertain Linear Programs: Extended Affinely Adjustable Robust Counterparts [J].
Chen, Xin ;
Zhang, Yuhan .
OPERATIONS RESEARCH, 2009, 57 (06) :1469-1482