Effect of organizational culture on delay in construction

被引:88
作者
Arditi, David [1 ]
Nayak, Shruti [1 ]
Damci, Atilla [2 ]
机构
[1] IIT, Dept Civil Architectural & Environm Engn, Chicago, IL 60616 USA
[2] Istanbul Tech Univ, Dept Civil Engn, Istanbul, Turkey
关键词
Organizational culture; Delay; Scheduling; PROJECTS; INDUSTRY; FRAMEWORK; INTERPLAY; NIGERIA; SECTOR; TURKEY; CLAIMS;
D O I
10.1016/j.ijproman.2016.10.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Delay is one of the most common problems in the construction industry. This study aims to explore the relationship between a construction company's organizational culture and delay. A questionnaire survey was administered to construction companies located in the U.S. and India in order to collect data on their organizational culture and the amount of delay that they experienced in their projects. The results of this study show that construction organizations in the U.S. are dominated by "clan" culture whereas those in India are dominated by "market" culture. The study also shows that the percentage of delay relative to project duration is lower in the U.S. compared to India. Despite the fact that delays are caused by a multitude of reasons often mentioned in the literature, statistical analysis indicates that there is also a significant relationship between organizational culture and the magnitude of delays. This relationship could be useful for a construction company in cultivating an organizational culture that is expected to reduce project delay. It could also be of benefit to international contractors relative to their expectations vis-a-vis time performance in projects undertaken in different countries. (C) 2016 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:136 / 147
页数:12
相关论文
共 94 条
[11]  
[Anonymous], DEV CULTURAL ASSETS
[12]  
[Anonymous], 2010, Culture and Organizations: Software of the Mind: Intercultural Cooperation and its Importance for Survival
[13]  
[Anonymous], 2007, THESIS
[14]  
[Anonymous], 2004, ORG CULTURE LEADERSH
[15]   Selecting a delay analysis method in resolving construction claims [J].
Department of Civil and Architectural Engineering, Illinois Institute of Technology, Construction Engineering and Management Program, 3201 South Dearborn Street, Chicago, IL 60616, United States .
Int. J. Proj. Manage., 2006, 2 (145-155) :145-155
[16]  
ARDITI D., 1995, Cost Engineering, V37, P20
[17]  
Arditi D., 1985, J CONSTR MANAGE EC, V3, P171, DOI [DOI 10.1080/01446198500000013, 10.1080/01446198500000013]
[18]   Analysis methods in time-based claims [J].
Arditi, David ;
Pattanakitchamroon, Thanat .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (04) :242-252
[19]  
Askansasy N.M., 2000, HDB ORG CULTURE CLIM
[20]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357