共 94 条
[11]
[Anonymous], DEV CULTURAL ASSETS
[12]
[Anonymous], 2010, Culture and Organizations: Software of the Mind: Intercultural Cooperation and its Importance for Survival
[13]
[Anonymous], 2007, THESIS
[14]
[Anonymous], 2004, ORG CULTURE LEADERSH
[15]
Selecting a delay analysis method in resolving construction claims
[J].
Int. J. Proj. Manage.,
2006, 2 (145-155)
:145-155
[16]
ARDITI D., 1995, Cost Engineering, V37, P20
[17]
Arditi D., 1985, J CONSTR MANAGE EC, V3, P171, DOI [DOI 10.1080/01446198500000013, 10.1080/01446198500000013]
[18]
Analysis methods in time-based claims
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2008, 134 (04)
:242-252
[19]
Askansasy N.M., 2000, HDB ORG CULTURE CLIM
[20]
Causes of delay in large construction projects
[J].
Int. J. Proj. Manage.,
2006, 4 (349-357)
:349-357